My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-353C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-353C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:00:02 AM
Creation date
10/1/2015 12:48:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-353C
Agenda Item Number
8.U.
Entity Name
Timothy Rose Contracting
Subject
12th. Street sidewalk
Area
16th Avenue to 11th Place
Project Number
0216
Bid Number
2008081
Supplemental fields
SmeadsoftID
7692
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No A- 8 material permitted in embankment . <br /> E . Payment shall be made under : <br /> Item No . 120- 1 — Excavation Regular — Per Cubic Yard <br /> Item No . 120-4 - Subsoil Excavation - Per Cubic Yard <br /> Item No . 120-6 - Embankment - Per Cubic Yard <br /> SECTION 00160 STABILIZING <br /> A . Sub Article 160- 5 . 1 is modified by the addition of the following : <br /> "The stabilization thickness indicated on plans shall be considered a minimum <br /> thickness . Thickness will vary to conform to the lines , and grades shown in the <br /> plans . " Minimum L . B . R . = 40 - No under-tolerance . <br /> B . Payment shall be made under: <br /> Item No . 160-4 - Type B Stabilization ( 12") - Per Square Yard <br /> SECTION 00285 OPTIONAL BASE COURSE <br /> A . Sub Article 285-4 is modified by the addition of the following : <br /> Base material , thickness and requirements are described in the construction plans . <br /> Only one type of alternate base material shall be used . No additional payment will <br /> be made for base thickness in excess of the specified thickness <br /> B . Payment shall be made under: <br /> Item No . 285 -707 - Base Group 7 - Per Square Yard <br /> SECTION 286 TURNOUT CONSTRUCTION <br /> Sub Article 286-6 is modified by the addition of the following : <br /> The cost of any bituminous material used in hot bituminous mix , form work , prime coat or <br /> tack coat , or any incidental labor or material shall not be paid for separately . <br /> Payment shall be made under : <br /> Item No . 286- 1 - 1 - Turnout Construction (Asphalt) - Square Yard <br /> GENERAL PROVISIONS <br /> 01025- 10 <br /> F: \Engineering\Capital Projects\0216-12th Street Between 16th Avenue and 11th Place\0216 Bid Documents\DIVISION 2 - Technical <br /> Provisions. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.