My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-353C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-353C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:00:02 AM
Creation date
10/1/2015 12:48:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-353C
Agenda Item Number
8.U.
Entity Name
Timothy Rose Contracting
Subject
12th. Street sidewalk
Area
16th Avenue to 11th Place
Project Number
0216
Bid Number
2008081
Supplemental fields
SmeadsoftID
7692
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Perform Work in accordance with ANSI /AWWA C651 . <br /> 1 . 06 REGULATORY REQUIREMENTS <br /> A. Conform to applicable Florida DEP requirements for performing the work of <br /> this Section . <br /> B . Work shall conform to Indian River County Standards . <br /> PART 2 - PRODUCTS <br /> 2 . 01 DISINFECTION CHEMICALS <br /> A . Chemicals : The disinfecting agent shall be sodium hypochlorite solution <br /> ANSI/AWWA B303 or liquid chlorine ANSI/AWWA B301 . Dry hypochlorite , <br /> similar to " HTH " or equal may also be used as the disinfecting agent . <br /> Bleach or Clorox is not acceptable . <br /> PART 3 - EXECUTION <br /> 3 . 01 EXAMINATION <br /> A. Verify that piping systems have been cleaned , inspected , and tested . <br /> B . Coordinate scheduling of flushing , pressure testing , and disinfection <br /> activities with tie-ins , certifications , and sequence of construction . <br /> 3 . 02 FLUSHING AND PRESSURE TESTING - PIPING <br /> A. The Contractor shall furnish and install suitable temporary testing plugs or <br /> caps for the water lines , all necessary pressure pumps , hose , pipe <br /> connections , meters , gauges and other similar equipment , and all labor <br /> required , all without additional compensation for conducting pressure and <br /> leakage tests and flushing of the piping . Flushing and pressure testing shall <br /> be conducted in the following order . <br /> B . After all piping lines have been installed and before pressure testing , each run <br /> of pipe shall be thoroughly flushed so as to remove all debris and foreign <br /> matter from the piping and equipment. Clean and flush all piping using <br /> potable water . Sufficient flushing water and pigging shall be introduced into <br /> the piping to produce a discharge that is clear with no evidence of silt or <br /> foreign matter is visible . Contractor to provide means of discharging and <br /> disposing of water at Contractor' s expense . <br /> C . Pressure testing ductile iron piping systems : <br /> 1 . The test pressure for the water piping , irrigation quality water piping , <br /> and force main piping systems constructed of ductile iron shall be <br /> 150 psi and this pressure shall be maintained for a period of not less <br /> than two hours . Tests shall be made between valves and as far as <br /> practicable and as approved by the Engineer . Potable water from the <br /> distribution system shall be used . Pressure shall not vary more than <br /> five (5) psi for piping during the test periods or as approved by the <br /> GENERAL PROVISIONS <br /> 01025- 19 <br /> R Engineering\Capital Projects\0216-12th Street Between 16th Avenue and 11th Place\0216 Bid Documents\DIVISION 2 - Technical <br /> Provisions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.