Laserfiche WebLink
Engineer. Allowable leakage shall be computed on the basis of <br />AWWA C-600. <br />2. All leaks evident at the surface shall be uncovered and repaired <br />regardless of the total leakage as indicated by the test, and all pipes, <br />valves and fittings and other materials found defective under the test <br />shall be removed and replaced at the Contractor's expense. Tests <br />shall be repeated until leakage has been reduced below the <br />allowable amount. <br />3. In the judgment of the Engineer, should it not be practical to follow <br />the foregoing procedures exactly for any reason, modifications in the <br />procedure shall be made as approved by the Engineer. In any event, <br />the Contractor shall be responsible for the ultimate water tightness of <br />the piping within the preceding requirements. <br />3.03 DISINFECTION <br />A. The Contractor shall furnish and install suitable temporary connections to the <br />piping, all necessary pressure pumps, hose, pipe connections, meters, <br />gauges and other similar equipment, and all labor required, all without <br />additional compensation for the disinfection of all required piping systems. <br />Disinfection shall be conducted on the following systems: <br />1. Water main piping and valves. <br />B. Conform to AWWA Standards and as modified herein. <br />C. Maintain disinfectant for a minimum of 8 hours in such a manner that the <br />entire system will be filled with water containing a minimum chlorine <br />concentration of 50 ppm at any point. <br />D. After the disinfecting agents have been permitted to remain for the specified <br />contact periods, the water lines, and valves shall be thoroughly flushed with <br />water until the residual chlorine tests are less than 2 PPM in each instance. <br />The determination of the amount of residual chlorine in the system shall be <br />made at such points and in accord with standard tests by means of a <br />standard orthotolodine test set. <br />3.04 BACTERIOLOGICAL SAMPLING <br />A. It shall be the responsibility of the Contractor under this contract to perform the <br />bacteriological testing required by the Florida Department of Environmental <br />Protection and Indian River County to obtain clearance of the water main <br />piping. The Contractor shall be responsible to disinfect and repeat testing <br />as needed until clearance is obtained for all required plant systems. The <br />Contractor shall be responsible to pay for additional water needed if the <br />bacteriological testing must be repeated for the clearance of the ground <br />storage tank. <br />GENERAL PROVISIONS <br />01025-20 <br />F:\Engineering\Capital Projects\0216-12th Street Between 16th Avenue and 11th Place\0216 Bid DocumentsVIVISION 2 -Technical <br />Provisions.doc <br />