Laserfiche WebLink
B . The piping systems require two (2) consecutive daily samples taken from the <br /> locations called out on the plans or as determined by the Engineer. The <br /> samples shall be taken at all the respective sample point locations . <br /> C . Sampling must be coordinated with Engineer and other construction activities <br /> so as to minimize re-sampling . <br /> D . Contractor shall submit schedule for bacteriological testing and pressure tests . <br /> E . The Contractor shall incur all costs needed to provide bacteriological <br /> clearance of the piping systems . <br /> 3 . 11 QUALITY CONTROL <br /> A . The laboratory and personnel collecting bacteriological samples shall be <br /> Florida State certified in accordance with FDEP requirements . <br /> + + END OF SECTION + + <br /> GENERAL PROVISIONS <br /> 01025-21 <br /> F:\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11th Place\0216 Bid Documents\DIVISION 2 - Technical <br /> Provisions.doc <br />