My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-353D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-353D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:03:22 AM
Creation date
10/1/2015 12:48:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-353D
Agenda Item Number
8.U.
Entity Name
Timothy Rose Contracting
Subject
12th. Street sidewalk
Area
16th Ave. to 11th Place
Project Number
0216
Bid Number
2008081
Supplemental fields
SmeadsoftID
7693
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
performance of the work yet to be performed , in contrast with the planned progress of performance of such <br /> work . Each such update and/or revision to the construction schedule shall be submitted to the Owner and <br /> Engineer . Failure of the Contractor to develop , update , revise, or submit the construction schedule(s) as <br /> aforesaid shall be sufficient grounds for the Owner to find the Contractor in material default and shall be <br /> sufficient cause to terminate the Contract or to withhold payment to the Contractor until a schedule or <br /> schedule update is submitted . <br /> C) The Contractor agrees that whenever it becomes apparent from the progress review meeting <br /> or CPM schedule that the contract completion date will not be met, the Contractor shall notify the Owner and <br /> Engineer of the potential schedule change within three (3 ) days of a commencement of delay or knowledge of <br /> a potential delay. Prior to requesting a time extension , Contractor shall execute some or all of the following <br /> remedial actions at Contractor's sole cost and expense : <br /> 1 . Increase manpower as necessary to eliminate work backlog . <br /> 2 . Increase the number of working hours per shift, shifts per working day, working days per <br /> week, construction equipment, or any combination of the foregoing to eliminate the <br /> backlog . <br /> 3 . Reschedule the work in conformance with specification requirements . <br /> d ) Neither the Owner nor the Contractor shall be considered to own the schedule float time . <br /> GC 12 LIQUIDATED DAMAGES . <br /> tial completion or final completion occurs later than the time <br /> If the actual completion date for substan <br /> indicated in the Special Terms or later than the scheduled completion date if a duly authorized change order <br /> for time is issued , liquidated damages in the amount(s) set forth in the Special Terms shall be paid by <br /> Contractor for unexcused delay in performance of the work. . Contractor agrees that Owner's actual damages <br /> in the event of unexcused delay are difficult to ascertain and therefore the parties agree that the sums <br /> established in the Special Terms are reasonably related to what damages Owner may suffer and are <br /> enforceable liquidated damages and not penalties . <br /> GC 12 SCHEDULE OF VALUES . <br /> Within ten ( 10) days after the date of the Owner's issuance of a Notice to Proceed , Contractor shall <br /> submit for review and approval of Owner and Engineer , a schedule of values , by phases of work, to show a <br /> breakdown of the Contract Price corresponding to the payment request breakdown and progress schedule line <br /> items . The schedule of values must also show dollar value for each unit of work scheduled . Change Orders <br /> are to be added as separate line items . <br /> GC 13 LAND FOR WORK. <br /> Contractor's access to the site and storage areas shall be as shown on the plans and as designated by the <br /> Owner . Access routes may also be used by County employees and other contractors . No other access points <br /> shall be allowed unless approved by the Owner. All contractor traffic authorized to enter the site shall be <br /> experienced in the route or guided by contractor personnel . The Contractor is responsible for immediate <br /> cleanup of any debris deposited along the access route as a result of its construction traffic. In the event the <br /> Owner provides conditions or reasonable restrictions on the use or access to the lands upon which or adjacent <br /> to the Work under this Contract is to be done, Contractor shall comply with all such conditions or restrictions . <br /> Any delay in the furnishing of these lands by the Owner shall be deemed proper cause for an equitable <br /> adjustment in both Contract price and time of completion . <br /> Owner, and its duly authorized employees and representatives , and representatives of all <br /> governmental agencies having jurisdiction over work areas or any part thereof, shall , at all reasonable times , <br /> have access to such areas and the premises used by Contractor . Contractor shall also arrange for Owner, its <br /> representatives and employees , to have access at all reasonable times to all places where equipment or <br /> materials are being manufactured , produced or fabricated for use under the Contract. <br /> GC 14 SURVEY LINES AND GRADE <br /> Unless otherwise specified , the Engineer shall furnish all land survey control points , base lines and <br /> benchmarks for the location of the work . The Contractor shall be responsible for the preservation of all lines , <br /> 33 <br /> F :\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and l lth Place\0216 Federal Contract <br /> Provisions .doc a29/M &T6:25 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.