Laserfiche WebLink
points, and elevations furnished and shall bear the expense of resetting same if Contractor or any of its <br />subcontractors move or destroy or render inaccurate any such base lines, points and elevations. From the <br />information provided by the Engineer, the Contractor shall develop and make all detail surveys and establish <br />lines and grades as required. The Contractor shall keep the Engineer informed as to his needs for base lines <br />or bench marks in order that the same may be furnished and all necessary measurements made for the <br />record with a minimum of inconvenience to the Engineer or delay to the Contractor. <br />GC 15 SITE CONDITIONS. <br />Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of <br />the work and the general and local conditions, and particularly, but without limitation, with respect to the <br />following: conditions affecting the transportation, access, disposal, handling and storage of materials; the <br />availability, quantity and quality of labor, water and electric power; availability and condition of roads; climatic <br />conditions; location of underground utilities; existing site conditions, topography and ground conditions; <br />subsurface geology, and nature and quantity of surface and subsurface materials to be encountered; and all <br />other matters which can in any way affect eh performance of the Contract or the cost associated therewith. <br />Contractor's failure to assess the site conditions will not relieve it from the responsibility for properly estimating <br />the costs and schedule of performing the work. <br />GC 16 SUBSOIL CONDITIONS. <br />Unless otherwise stipulated in the plans and specification, no subsoil investigations have been made. <br />The Contractor shall satisfy itself as to all subsoil conditions. <br />GC 17 SURFACE AND SUBSURFACE WATER <br />The control of surface and subsurface water by Contractor shall be permitted by the proper regulatory <br />agencies, with copies submitted to Owner. Contractor shall immediately remedy any permit violations and <br />shall be responsible for any fines or penalties assessed by such agencies for permit violations. <br />CG 18 CONTRACTOR WORK AREA <br />Contractor's work area on the job site will be assigned by Owner. Contractor shall confine its office, <br />storage, assembly, equipment and parking to the areas so assigned. Should Contractor find it necessary to <br />use any additional land outside the work site for any purpose, Contractor shall, at its expense, provide for the <br />use of any such additional land. <br />CG 19 CONTRACTOR -FURNISHED MATERIALS EQUIPMENT AND WORKMANSHIP <br />Contractor shall provide and use on any work only such construction plant and equipment as are <br />capable of producing the quality and quantity of work and materials required by the drawings and <br />specifications within the established schedule. Only new, unused materials and items of recent manufacture, <br />of designated quality, free from defects, will be accepted. Contractor shall, if requested, furnish evidence <br />satisfactory to the Owner as to the kind and quality of materials. Contractor shall utilize lumber, timber and <br />other forest products produced and manufactured in Florida when such products are available and their price, <br />fitness and quality are equal to comparable products. Upon written order of the Owner, Contractor shall <br />discontinue operation of unsatisfactory plant, equipment and/or facilities. Owner will be the final authority for <br />determining conformance of workmanship, materials, equipment and systems with the requirements of the <br />Contract. (255.20) <br />Where Contractor supplied drawings are required for planning or performance of the work, such <br />drawings shall include, but not be limited to, matchmarks, erection diagrams and other details such as field <br />connections for property installation. Such drawings shall be submitted by and at the expense of Contractor. <br />At least 21 days shall be allowed for review by Owner. If drawings show variations from the contract <br />requirements, the Contractor shall describe such variations in writing at the time of submission. Review and <br />permission to proceed by Owner does not constitute acceptance or approval of design details, calculations, <br />analyses, test methods or materials develop or selected by the Contractor and does not relieve Contractor <br />from full compliance with contractual obligations. <br />Where samples are required, samples shall be submitted by and at the expense of Contractor. <br />Materials represented by such samples shall not be manufactured, delivered to the site or incorporated into <br />34 <br />F:\Engineering\Capital Projects\0216-12th Street Between 16th Avenue and 11th Place\0216 Federal Contract <br />Provisions.doc &2V2" 3.0625 PM <br />