Laserfiche WebLink
points , and elevations furnished and shall bear the expense of resetting same if Contractor or any of its <br /> subcontractors move or destroy or render inaccurate any such base lines , points and elevations . From the <br /> information provided by the Engineer, the Contractor shall develop and make all detail surveys and establish <br /> lines and grades as required . The Contractor shall keep the Engineer informed as to his needs for base lines <br /> or bench marks in order that the same may be furnished and all necessary measurements made for the <br /> record with a minimum of inconvenience to the Engineer or delay to the Contractor. <br /> GC 15 SITE CONDITIONS . <br /> Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of <br /> the work and the general and local conditions , and particularly, but without limitation , with respect to the <br /> following : conditions affecting the transportation , access , disposal , handling and storage of materials ; the <br /> availability, quantity and quality of labor, water and electric power; availability and condition of roads ; climatic <br /> conditions ; location of underground utilities ; existing site conditions , topography and ground conditions ; <br /> subsurface geology, and nature and quantity of surface and subsurface materials to be encountered ; and all <br /> other matters which can in any way affect eh performance of the Contract or the cost associated therewith . <br /> Contractor's failure to assess the site conditions will not relieve it from the responsibility for properly estimating <br /> the costs and schedule of performing the work. <br /> GC 16 SUBSOIL CONDITIONS . <br /> Unless otherwise stipulated in the plans and specification , no subsoil investigations have been made . <br /> The Contractor shall satisfy itself as to all subsoil conditions . <br /> GC 17 SURFACE AND SUBSURFACE WATER <br /> The control of surface and subsurface water by Contractor shall be permitted by the proper regulatory <br /> agencies , with copies submitted to Owner. Contractor shall immediately remedy any permit violations and <br /> shall be responsible for any fines or penalties assessed by such agencies for permit violations . <br /> CG 18 CONTRACTOR WORK AREA <br /> Contractor's work area on the job site will be assigned by Owner. Contractor shall confine its office , <br /> storage , assembly, equipment and parking to the areas so assigned . Should Contractor find it necessary to <br /> use any additional land outside the work site for any purpose , Contractor shall , at its expense , provide for the <br /> use of any such additional land . <br /> CG 19 CONTRACTOR- FURNISHED MATERIALS EQUIPMENT AND WORKMANSHIP <br /> Contractor shall provide and use on any work only such construction plant and equipment as are <br /> capable of producing the quality and quantity of work and materials required by the drawings and <br /> specifications within the established schedule . Only new, unused materials and items of recent manufacture, <br /> of designated quality, free from defects , will be accepted . Contractor shall , if requested , furnish evidence <br /> satisfactory to the Owner as to the kind and quality of materials . Contractor shall utilize lumber, timber and <br /> other forest products produced and manufactured in Florida when such products are available and their price , <br /> fitness and quality are equal to comparable products . Upon written order of the Owner, Contractor shall <br /> discontinue operation of unsatisfactory plant , equipment and/or facilities . Owner will be the final authority for <br /> determining conformance of workmanship , materials , equipment and systems with the requirements of the <br /> Contract . (255 .20) <br /> Where Contractor supplied drawings are required for planning or performance of the work, such <br /> drawings shall include , but not be limited to , matchmarks , erection diagrams and other details such as field <br /> connections for property installation . Such drawings shall be submitted by and at the expense of Contractor. <br /> At least 21 days shall be allowed for review by Owner. If drawings show variations from the contract <br /> requirements , the Contractor shall describe such variations in writing at the time of submission . Review and <br /> permission to proceed by Owner does not constitute acceptance or approval of design details , calculations , <br /> analyses , test methods or materials develop or selected by the Contractor and does not relieve Contractor <br /> from full compliance with contractual obligations . <br /> Where samples are required , samples shall be submitted by and at the expense of Contractor. <br /> Materials represented by such samples shall not be manufactured , delivered to the site or incorporated into <br /> 34 <br /> F :\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11th Place\0216 Federal Contract <br /> Provisions .doc &292006 3:0625 PM <br />