Upon approval by Engineer and Owner as to any adjustments to the contract price and/or time for <br /> changes performed under a CDD , such approval shall be recorded by the preparation of a change order. The <br /> Contractor shall not seek payment for work performed pursuant to a CDD until it has been converted to a <br /> change order . <br /> The Engineer shall have the authority to order minor changes in the work which do not involve <br /> adjustment to the Contract price or time and which are not inconsistent with the intent of the contract <br /> documents . <br /> A bond rider from the Surety shall be submitted to the County with each change order that increases <br /> the Contract price . <br /> GC 38 USE OF COMPLETED PORTIONS , <br /> The Owner shall have the right to take possession of and use any substantially completed portions of <br /> the work. Such use by Owner shall not be construed as constituting final acceptance , and shall neither relieve <br /> Contractor of any of its responsibilities under the Contract, nor act as a waiver by Owner of any contract <br /> provisions ; provided that the Contractor shall not be liable for any repair or maintenance required due to <br /> ordinary wear and tear resulting from such use . However, if such use increases the cost or delays the <br /> completion of remaining portions of work, Contractor shall be entitled to an equitable adjustment under the <br /> contract. <br /> GC 39 CLEANING UP . <br /> Upon completion of any portion of the work, the Contractor shall remove at his own expense from the <br /> Owner's property all temporary structures , equipment and surplus materials not required for later stages of <br /> work, rubbish , and waste materials resulting from his operations . Contractor shall make its own <br /> arrangements , at its own cost , for disposal of rubbish and waste materials . The Owner reserves the right to <br /> retain any surplus or salvage materials . <br /> CG 40 BASIC REQUIREMENTS PRIOR TO SUBSTANTIAL COMPLETION <br /> The following items shall be completed as a condition precedent to substantial completion and prior to <br /> a request by the Contractor for inspection for substantial completion . In the event the Contract does not define <br /> substantial completion , the following are also conditions for final completion and acceptance : <br /> 1 . All general construction completed and the project components shall be clean and all <br /> systems fully functional . <br /> 2 . All mechanical and electrical work substantially complete , fixtures in place , connected , <br /> cleaned and ready for use . <br /> 3 . All electrical circuits shall be scheduled in panels and all panels and disconnect switches <br /> properly labeled . <br /> 4 . Issuance of all permits and certificates , inspections , and other approvals and releases by <br /> governing authorities required for Owner's occupancy and use of the project . <br /> 5 . Project site shall be cleared of Contractor's excess equipment and/or supplies and material . <br /> 6 . All sets of operation and maintenance manuals for all equipment shall have been submitted , <br /> as referenced in the technical specifications . <br /> 7 . Manufacturers' certifications and warranties shall be delivered to Owner . <br /> 8 . All operations and maintenance manuals for all equipment shall be delivered to Owner . <br /> 9 . All required spare parts , as well as any special devises and tools shall be delivered to Owner. <br /> 10 . All keys and blanks shall have been provided . <br /> 11 . Punch list of items required to render the construction services complete , satisfactory and <br /> acceptable to the Owner . If the Contract provides for a multi-phased or multi-structure project, a punch list <br /> must be developed for each phase or structure . <br /> Contractor shall arrange a joint site and project inspection (s ) with Engineer for inspection for <br /> substantial completion and development of a punch list for the completion of construction services . Said <br /> punch list shall be prepared not later than thirty (30 ) days after the inspection for substantial completion . <br /> Punch list items recorded as a result of inspections for substantial completion shall be corrected by the <br /> Contractor prior to any request for final inspection and acceptance . <br /> 39 <br /> F :\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11th Place\0216 Federal Contract <br /> Provisions .doc 8/29/M U625 PM <br />