My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> 1 . 3 TREE AND PLANT PROTECTION <br /> A. Protect existing trees , shrubs and plants on or adjacent to the site that are shown <br /> or designated to remain in place against unnecessary cutting , breaking or <br /> skinning of trunk , branches , bark or roots . <br /> B . Do not store or park materials or equipment within the drip line . <br /> C . Install temporary fences or barricades to protect trees and plants in areas subject <br /> to traffic . <br /> D . Fires shall not be permitted under or adjacent to trees and plants . <br /> E . Within the limits of the Work , water trees and plants that are to remain , in order <br /> to maintain their health during construction operations . <br /> F . Cover all exposed roots with burlap and keep it continuously wet . Cover all <br /> exposed roots with earth as soon as possible . Protect root systems from <br /> mechanical damage and damage by erosion , flooding , run -off or noxious <br /> materials in solution . <br /> G . If branches or trunks are damaged , prune branches immediately and protect the <br /> cut or damaged areas with emulsified asphalt compounded specifically for <br /> horticultural use . <br /> H . Remove all damaged trees and plants that die or suffer permanent injury and <br /> replace them with a specimen of equal or better quality . <br /> I . Coordinate Work in this Section with requirements of other sections herein . <br /> 1A PROTECTION OF IRRIGATION <br /> The CONTRACTOR shall be responsible for maintaining in good condition all <br /> irrigation systems within the easements , which could be damaged by <br /> construction activities . The CONTRACTOR shall repair any irrigation systems <br /> damaged by construction activities within two (2 ) days . <br /> 1 . 5 PROTECTION OF EXISTING STRUCTURES <br /> A. Underground Structures : <br /> 1 . Underground structures are defined to include , but not be limited to , all <br /> sewer , water , gas , and other piping , and manholes , chambers , electrical <br /> conduits , tunnels and other existing subsurface work located within or adja- <br /> cent to the limits of the Work. <br /> 2 . All underground structures known to ENGINEER except service connections <br /> for water, sewer , electric , and telephone are shown . This information is <br /> shown for the assistance of CONTRACTOR in accordance with the best <br /> information available , but is not guaranteed to be correct or complete . The <br /> 01541 -2 F :\Engineering\Special Projects\Eagle Trace Phase <br /> 2\contract Documents\Eagle Trace Subdivision Phase II\01541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.