Laserfiche WebLink
L <br /> b . Manufacturer's literature with product description , performance and test <br /> data , and reference standards . <br /> c . Samples , if appropriate . <br /> d . Name and address of similar projects on which product was used , and <br /> date of installation . <br /> 2 . For construction methods ( if specified ) : <br /> a . Detailed description of proposed method . <br /> b . Drawings illustrating method . <br /> 3 . Such other data as the ENGINEER may require to establish that the <br /> proposed substitution is equal to the product , manufacturer or method <br /> specified . <br /> C . In making Request for Substitution , CONTRACTOR represents that : <br /> 1 . CONTRACTOR has investigated proposed substitution , and determined <br /> that it is equal to or superior in all respects to the product , manufacturer or <br /> method specified . <br /> 2 . CONTRACTOR will provide the same or better guarantees or warranties for <br /> proposed substitution as for product , manufacturer, or method specified . <br /> 3 . CONTRACTOR waives all claims for additional costs or extension of time <br /> related to a proposed substitution that subsequently may become apparent . <br /> D . A proposed substitution will not be accepted if: <br /> 1 . Acceptance will require changes in the design concept or a substantial <br /> revision of the Contract Documents . <br /> 2 . It will delay completion of the Work , or the work of other contractors . <br /> It is indicated or implied on a Shop Drawing and is not accompanied by a <br /> formal Request for Substitution from CONTRACTOR . <br /> L I <br /> EER determines that a proposed substitute is not equal to that <br /> E . If the ENGIN p p <br /> specified , furnish the product , manufacturer , or method specified at no additional <br /> cost to OWNER . <br /> F . Approval of a substitution will not relieve CONTRACTOR from the requirement <br /> for submission of Shop Drawings as set forth in the Contract Documents , <br /> G . The procedure for review by Engineer will include the following : <br /> 1 . Requests for review of substitute items of material and equipment will <br /> not be accepted by Engineer from anyone other than CONTRACTOR . <br /> 2 . Upon receipt of an application for review of a substitution , Engineer will <br /> determine whether the review will be more extensive than a normal shop <br /> drawing review for the specified item . <br /> 3 . If the substitution will not require a more extensive review , Engineer will <br /> proceed with the review without additional cost to CONTRACTOR . <br /> 01630-2 01630 Substitutions <br /> I L F :\Engineering\Special Projects\Eagle Trace Phase Montract Documents\Eagle Trace Subdivision Phase II\01630 - Substitutions .doc <br />