My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rrr <br /> 4 . If the substitution requires a more extensive review , Engineer will proceed <br /> with the review only after CONTRACTOR has agreed to reimburse Owner for <br /> the review cost . <br /> 5 . Engineer may require CONTRACTOR to furnish at CONTRACTOR' s expense <br /> additional data about the proposed substitute . <br /> H . Any redesign of structural members shall be performed by , and the plans signed <br /> and sealed by , a Professional Engineer registered in the State of Florida . The <br /> redesign shall be at the CONTRACTOR' s expense . Any redesign will require an <br /> extensive review by the Engineer. The CONTRACTOR must agree to reimburse <br /> the Owner for the review cost prior to the Owner' s Engineer proceeding with the <br /> design review . The ENGINEER' s hourly rate for review is $ 125 per hour . The <br /> ENGINEER' s estimated cost of review shall be provided to the CONTRACTOR <br /> prior to proceeding with the review to allow the CONTRACTOR the opportunity to <br /> rescind the request . <br /> I . Engineer will be allowed a reasonable time within which to evaluate each <br /> proposed substitution . Engineer will be the sole judge of acceptability and shall <br /> have the right to deny use of any proposed substitution . The CONTRACTOR <br /> shall not order , install , or utilize any substitution without either an executed <br /> Change Order or Engineer' s notation on the reviewed shop drawing . Owner may <br /> require CONTRACTOR to furnish at CONTRACTOR' s expense a special <br /> manufacturer' s performance guarantee (s ) or other surety with respect to any <br /> substitute and an indemnification by the CONTRACTOR . ENGINEER will record <br /> time required by Engineer and Engineer' s consultants in evaluating substitutions <br /> proposed by CONTRACTOR and in making changes in the Contract Documents <br /> occasioned thereby . Whether or not a proposed substitute is used , <br /> CONTRACTOR shall reimburse Owner for the charges of Engineer and <br /> Engineer' s consultants for evaluating each proposed substitute . <br /> J . Substitute materials or equipment may be proposed for acceptance in <br /> accordance with this Section . In the event that substitute materials or equipment <br /> are used and are less costly than the originally specified material or equipment , <br /> than the net difference in cost shall benefit the Owner and CONTRACTOR in <br /> equal proportions . This cost difference shall not be reduced by any failure of the <br /> CONTRACTOR to base his bid on the named materials or equipment . <br /> + + END OF SECTION + + <br /> 01630-3 01630 Substitutions <br /> F:\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase 11\01 630 - Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.