My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G . It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed , <br /> destroyed , or damaged during construction . Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction . <br /> H . When finished surfaces require cleaning with cleaning materials , use only <br /> those cleaning materials which will not create hazards to health or property <br /> and which will not damage the surfaces . Use cleaning materials only on <br /> those surfaces recommended by the manufacturer. Follow the <br /> manufacturer's directions and recommendations at all times . <br /> I . Keep the amount of dust produced during construction activities to a <br /> minimum . At CONTRACTOR' s expense , spray water or other dust control <br /> agents over the areas , which are producing the dust . Schedule <br /> construction operations so that dust and other contaminants will not fall on <br /> wet or newly coated surfaces . <br /> 1 . 3 SITE CLEANUP AND RESTORATION <br /> Prior to final completion , the OWNER , ENGINEER , INDIAN RIVER FARMS <br /> WATER CONTROL DISTRICT , and CONTRACTOR shall review the site with <br /> regards to site cleanup and restoration . Clean and/or restore all items determined <br /> to be unsatisfactory by the OWNER or ENGINEER , at no additional expense . <br /> + + END OF SECTION + + <br /> 01710 Site Cleanup <br /> 01710-2 <br /> F:\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase M01710 - Site Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.