My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 9611A & 0001 <br /> TECHNICAL PROVISIONS <br /> STANDARD SPECIFICATIONS <br /> All work of this Contract shall conform to the applicable technical specifications of <br /> Florida Department of Transportation Standard Specifications for Road and Bridge <br /> Construction , current edition , and Supplements thereto as noted in the Special <br /> Provisions and addenda thereto , except as modified and supplemented hereinafter . <br /> Reference to Article numbers herein -after apply to the FDOT Standard <br /> Specifications , and reference in FDOT Standard Specifications to Department shall <br /> be taken as the Owner or its appointed Representative . Wherever the <br /> Specifications , Supplementals , etc , may refer to the " Owner" , " Department" , " State <br /> of Florida Department of Transportation " , or words relating to offices of State <br /> Government , such words shall be taken as meaning Owner or Indian River County , <br /> Florida . Wherever the word Resident Engineer appears , it shall be taken to mean <br /> an authorized representative of the Owner' s Engineer on the Project ( Resident <br /> Construction Inspector) who will act as an agent for Indian River County , assigned <br /> to observe the progress quantity and quality of the work. <br /> 101 MOBILIZATION <br /> Perform preparatory work and operations in mobilizing for beginning work on the <br /> project , including , but not limited to , those operations necessary for the movement <br /> of personnel , equipment , supplies , and incidentals to the project site and for the <br /> establishment of temporary offices , buildings , safety equipment and first aid <br /> supplies , and sanitary and other facilities . <br /> Include the costs of bonds and any required insurance and any other <br /> preconstruction expense necessary for the start of the work , excluding the cost of <br /> construction materials . <br /> Payment shall be made under : <br /> Item No . 101 - 1 Mobilization Lump Sum <br /> 102 , MAINTENANCE OF TRAFFIC <br /> A. General : Work under this section consists of maintaining traffic within the limits <br /> of the project for the duration of construction in accordance with the U . S . <br /> Department of Transportation 's Manual On Uniform Traffic Control Devices <br /> ( MUTCD ) 2000 Edition , FDOT Index 600 Series and FDOT Standard <br /> Specification Section 102 . The purpose of the Traffic Control Plan is to depict <br /> the concept of feasible construction sequencing and maintenance of traffic . The <br /> Contractor may submit to the Engineer an alternate plan for review and <br /> approval , one week prior to the preconstruction conference . The Traffic Control <br /> Plan indicates typical signing , marking and barricade locations and types . <br /> Additional details are found in the MUTCD , FDOT Index (600 Series ) and <br /> Standard Specifications . The Contractor shall install only . new TCP signs and <br /> shall be Engineer grade . <br /> FAEngineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase II\9611A & 0001 - Technical <br /> Provisions .doc - 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.