My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Be Compensation : All compensation for maintenance of traffic including <br /> barricades (Type II ) , Barricades (Type III ) , Temporary Pavement , Off- Duty <br /> Police or Sheriff Deputy , Concrete Barrier (Temporary ) and vertical panels <br /> boards , shall be lump sum . This shall include all items and services <br /> necessary for the safe maintenance of traffic within the project limits . This <br /> shall include , but not be limited to , flaggers , construction and advisory <br /> signing , detours , temporary retaining systems , embankment , base material , <br /> asphaltic concrete , striping , cones , maintenance of pavement , asphaltic <br /> concrete curb , stormwater removal , temporary drainage structures and pipe , r <br /> pumps , commercial material for driveway maintenance , flashing arrow <br /> boards , high intensity flashing lights , removable and temporary pavement <br /> markings , and temporary reflective pavement markers , temporary pavement, <br /> for maintenance of traffic. <br /> C . Non - Compliance : Should the Owner or Engineer determine that traffic within <br /> the project is not being maintained in accordance with the approved traffic <br /> control plan or presents a public safety concern , the contractor shall have <br /> until the end of the working day , in which notification is given , to take action <br /> to modify the maintenance of traffic . Should the contractor fail to make such <br /> modification the Owner shall have the option to fine the Contractor $400 per <br /> day until remedied . <br /> D . Payment shall be made under: <br /> Item No . 102- 1 Maintenance of Traffic - Lump Sum <br /> 104 . EROSION AND WATER POLLUTION CONTROL <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A. This Section covers erosion control and the treatment of dewatering water <br /> and stormwater runoff from the construction site and work area . The <br /> pollution control measures shall prevent turbid or otherwise polluted waters <br /> from being discharged from the construction site or work area , to <br /> undeveloped portions of the site or off-site . <br /> Be The OWNER considers pollution from dewatering water and stormwater <br /> runoff from a construction site or work area to be a very serious offense . The <br /> CONTRACTOR is solely responsible for preventing pollution caused by <br /> dewatering water and stormwater runoff from the construction site or work <br /> area . <br /> C . The pollution control measures specified herein represent minimum <br /> standards to be adhered to by the CONTRACTOR throughout the Project' s <br /> FAEngineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase II\9611A & 0001 - Technical <br /> Provisions .doc - 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.