My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prevention Plan , prepared by the State certified erosion control <br /> subcontractor . The CONTRACTOR shall complete the certification provided <br /> at the end of this Section and it shall be a part of the Stormwater Pollution <br /> Prevention Plan . <br /> 1 . 6 " POLLUTION " AND CERTAIN UNCONTESTABLE POLLUTION EVENTS <br /> DEFINED <br /> A. Except as may be defined otherwise in paragraphs 1 . 6 . 13 , 1 . 6 . C , and 1 . 6 . D , <br /> " pollution " is the presence in off-site waters of any substances , contaminants , <br /> or manmade or human-induced impairment of waters , or alteration of the <br /> chemical , physical , biological , or radiological integrity of water in quantities or <br /> at levels which are or may be potentially harmful or injurious to human health <br /> or welfare , animal or plant life , or property . Pollutants to be removed include <br /> but are not limited to , sediment and suspended solids , solid and sanitary <br /> wastes , phosphorus , nitrogen , pesticides , oil and grease , concrete truck <br /> washout , construction chemicals , and construction debris . <br /> B . When the Discharge is Directly Into an Existing Water Body , Pollution Occurs <br /> When . . . An existing water body ( including ditches and canals ) is defined to <br /> be polluted by the CONTRACTOR' s operations when at any time , the <br /> turbidity of the water immediately downstream of the CONTRACTOR' s <br /> discharge point(s) is 29 nephelometric turbidity units ( NTUs ) higher than the <br /> turbidity of the background water upstream of the discharge point( s ) . [See <br /> Fla . Administrative Code 62-302 . 530] The ENGINEER or OWNER shall <br /> determine the locations where the turbidity is measured . <br /> C . When the Discharge is not Directly Into an Existing Water Body , Pollution <br /> Occurs When . . . In some instances , dewatering water or stormwater runoff <br /> from the construction site or work area may reach a water body indirectly , <br /> such as after traveling through pipes or by overland flow . Before <br /> construction commences , the OWNER or ENGINEER will measure <br /> background levels of total suspended solids (TSS ) and turbidity , in the <br /> immediate vicinity of the discharge water' s ultimate discharge point into the <br /> receiving water body . If the discharge water' s TSS and turbidity <br /> measurements exceed these pre-construction background values by 29 <br /> NTUs for turbidity , then the discharge from the CONTRACTOR Is operations <br /> is defined to be polluted . <br /> D . Pollution Always Occurs When . . . .The discharge is defined to be polluted <br /> whenever any of the following is present in the discharge water: <br /> ( 1 ) Hazardous waste or hazardous materials in any quantity , <br /> (2 ) Any petroleum product or by-product in any quantity , <br /> (3 ) Any chemical in any quantity , or <br /> (4 ) Concentrated pollutants . <br /> E . Above paragraphs 1 . 6 . 13 , 1 . 6 . C , and 1 . 6 . D do not in any way , limit the types <br /> of conditions in which pollution may be determined to occur . <br /> 1 . 7 PENALTIES FOR NONCOMPLIANCE WITH THIS SECTION <br /> FAEngineering\Special Projects\Eagle Trace Phase Montract Documents\Eagle Trace Subdivision Phase II\9611A & 0001 - Technical <br /> Provisions .doc - 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.