My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
manufacturer' s specifications . Use as many of the specified filtration <br /> devices as required , at no additional cost to the OWNER . <br /> 3 . Removal : The Contractor will be responsible for removal of all filtration <br /> devices . <br /> 4 . Product : All materials shall be new and unused . <br /> a . "SILTSACK" ( regular flow) , supplied by ACF Environmental , <br /> Inc. ( 1 -800448-3636 ) . <br /> b . " FloGuard + PLUS , " supplied by Kristar Enterprises , Inc . <br /> ( 1 -800 - 579-8819 ) . <br /> c . Or equivalent . <br /> F . Construction Site Egress Driveways : Minimize the transport of sediment and <br /> soil from the construction site or work area by vehicle wheels . Construct a <br /> crushed rock driving surface at the vehicle exit point(s ) . Provide an area <br /> large enough to remove the sediment and soil from vehicle wheels before the <br /> vehicle leaves the construction site or work area . Provide wash-down <br /> stations as required to wash vehicle tires and retain all washwater on -site . <br /> G . Rock and Stone for Erosion Control and Pollution Control and Treatment : <br /> 1 . Crushed Limerock : Crushed limerock shall not be used under any <br /> circumstance . <br /> 2 . Acceptable Material : FDOT #4 non -calcareous aggregate ( usually <br /> granite ) , washed and meeting the requirements of FDOT Standard <br /> Specifications for Road and Bridge Construction , Section 901 , <br /> H . Hay Bales : Hay bales shall not be used . <br /> PART 3 EXECUTION <br /> A . Design , construct, and maintain the pollution control and treatment system to <br /> minimize erosion and capture , and remove pollutants from the construction <br /> site and from all other areas disturbed by construction activities . <br /> PART 4 COMPENSATION <br /> A. All payment for the above items shall be made under: <br /> Item No . 104- 13 — Staked Silt Fence — Per Linear Foot <br /> [The remainder of this page was left blank intentionally] <br /> F :\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase II\9611A & 0001 - Technical <br /> Provisions.doc . 8 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.