My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S = STANDARD DEVIATION OF THE NUMBER <br /> OF OBSERVATIONS , MEASUREMENTS OR <br /> CALCULATED WATER APPLICATIONS AT <br /> POINTS BENEATH THE IRRIGATION <br /> SYSTEM , AND <br /> X = AVERAGE DEPTH OR VOLUME OF WATER <br /> MEASURED AT ALL OBSERVATION <br /> POINTS , <br /> SPRINKLER/EMITTER COVERAGE TESTING <br /> A . ALL SPRINKLERS MUST BE ADJUSTED TO MINIMIZE OVER- <br /> SPRAY ONTO BUILDINGS AND PAVED AREAS . <br /> B . ALL SPRINKLER CONTROLS MUST BE ADJUSTED TO MINIMIZE <br /> RUNOFF OF IRRIGATION WATER . <br /> C . ALL SPRINKLERS MUST OPERATE AT THEIR DESIGN RADIUS OF <br /> THROW . <br /> D . SPRAY PATTERNS MUST OVERLAP AS DESIGNED , <br /> E . VERIFY THAT THE SPRINKLERS ARE CONNECTED TO THE <br /> APPROPRIATE ZONE , <br /> F . VERIFY THAT NOZZLE OR EMITTER SIZES AND TYPES CALLED <br /> FOR IN THE SYSTEM DESIGN HAVE BEEN USED . <br /> PRESSURE DISTRIBUTION TESTING <br /> A . PRESSURE HEAD LOSS TESTS : THE DESIGN OPERATING <br /> PRESSURE OF THE SYSTEM SHALL BE STATED ON THE PLAN , <br /> THE PRESSURE AT ANY POINT IN THE SYSTEM SHALL NOT BE <br /> MORE THAN PLUS OR MINUS 10 % OF THE DESIGN OPERATING <br /> PRESSURE AT THAT POINT , <br /> B . TESTING WILL BE PERFORMED AS FOLLOWS : <br /> 1 . ZONES TO BE TESTED WILL INCLUDE , AT MINIMUM , THE <br /> LARGEST ZONE , SMALLEST ZONE , THE ZONE CLOSEST TO <br /> THE SOURCE IN TERMS OF MAINLINE DISTANCE , AND THE <br /> ZONE FARTHEST FROM THE SOURCE IN TERMS OF <br /> MAINLINE DISTANCE . <br /> 2 , TESTING OF EACH ZONE WILL BE DONE BY MEASURING <br /> PRESSURE AT A MINIMUM OF 2 POINTS , ONE PRESSURE <br /> WILL BE MEASURED AT THE SPRINKLER CLOSEST TO THE <br /> ZONE CONTROL VALVE AND THE SECOND WILL BE <br /> MEASURED AT THE SPRINKLER FARTHEST FROM THE ZONE <br /> CONTROL VALVE , <br /> BACKFLOW PREVENTION ASSEMBLY TESTING <br /> A. A CERTIFIED TECHNICIAN WILL TEST ALL ASSEMBLIES THAT <br /> CAN BE TESTED PRIOR TO BEING PLACED INTO SERVICE , <br /> F:\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase <br /> II\IRRIGATION SPECIFICATIONS from W. F. McCain .doc . 15 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.