My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE RESTORATION <br /> A. VERIFY THAT ALL EXISTING LANDSCAPING , PAVEMENT , AND <br /> GRADE OF AREAS AFFECTED BY WORK WERE RESTORED TO <br /> ORIGINAL CONDITION OR TO THE SATISFACTION OF THE <br /> SYSTEM OWNER , <br /> Be VERIFY THAT THE PIPELINE TRENCHES HAVE BEEN PROPERLY <br /> COMPACTED TO THE DENSITIES REQUIRED BY THE PLANS AND <br /> SPECIFICATIONS , <br /> RAINFALL SHUTOFF DEVICE <br /> THE DEVICE SHALL BE TESTED TO ENSURE PROPER SHUT OFF OF <br /> CONTROL EQUIPMENT . <br /> CERTIFICATION <br /> A . ALL INSPECTIONS AND TESTS DESCRIBED HEREIN WILL BE <br /> CERTIFIED TO THE OWNER IN WRITING BY THE INSTALLING <br /> CONTRACTOR, CERTIFICATION WILL INCLUDE THE FOLLOWING : <br /> 1 . THE DATE ON WHICH INSPECTIONS AND/OR TESTS WERE <br /> PERFORMED . <br /> 2 . LIST OF ATTENDEES AT INSPECTIONS/TESTS , <br /> 3 . THE SIGNATURE OF THE CONTRACTORS . <br /> 4 , RECORD DRAWING ON 24 X 36 SHEET . <br /> Be IT IS SUGGESTED THAT , UPON RECEIPT OF THE LETTER OF <br /> CERTIFICATION , THE GOVERNING INSPECTION AUTHORITIES <br /> PERFORM AT LEAST THE FOLLOWING INSPECTIONS : <br /> 1 . INSPECT BACKFLOW PREVENTION ASSEMBLIES TO VERIFY <br /> THAT THE MAKE , MODEL , AND SIZE CONFORM TO <br /> SPECIFICATIONS , AND IT WAS INSTALLED AND FUNCTIONS <br /> IN CONFORMANCE WITH APPLICABLE CODE , CONTRACTOR <br /> TO PROVIDE CURRENT CERTIFICATION OF UNIT , <br /> 2 . INSPECT VALVES TO VERIFY THEY ARE PROPERLY HOUSED <br /> AND INSTALLED TO GRADE . WIRE SPLICES AND <br /> CONNECTIONS SHALL BE MADE USING APPROPRIATE <br /> METHODS , <br /> 3 , INSPECT CONTROLLING DEVICES TO VERIFY THAT THEY <br /> FUNCTION , AND TO ASSURE THAT THEY CONFORM TO <br /> APPLICABLE CODES . <br /> 4 . OBSERVE THE SYSTEM OPERATING THROUGH ONE <br /> COMPLETE CYCLE (WITH ABBREVIATED IRRIGATION <br /> PERIODS ) OF THE CONTROL SYSTEM . <br /> R\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase <br /> II\IRRIGATION SPECIFICATIONS from W. F . McCain .doc ' 16 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.