My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-321
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:20:42 PM
Creation date
10/1/2015 12:42:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-321
Agenda Item Number
15.B.3
Entity Name
Trademark Metals Recycling LLC
Subject
Scrap Metal Processing Attachment 1
Alternate Name
TMR
Supplemental fields
SmeadsoftID
7621
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trademark Metals Recycling LLC <br />SPECIFICATIONS FOR THE <br />DISPOSAL OF SCRAP METAL <br />AT THE INDIAN RIVER COUNTY LANDFILL <br />EXHIBIT 2 <br />July, 2007 <br />INTENT <br />Removal of scrap metal and discarded appliances from the Indian River County <br />Landfill to be sold as recyclables. <br />SPECIFICATIONS: <br />1. Indian River County will establish a separate site at the Landfill for the <br />collection and storage of scrap metal and appliances. All refrigerators will <br />be stood upright for purposes of purging CFC. <br />2, The Contractor's vehicle shall weigh empty upon the Landfill scales upon <br />entering the Landfill. The same vehicle, when loaded, shall weigh loaded <br />upon leaving the Landfill. The net weight shall be the weight of material <br />removed and sold as recyclable. <br />;. The Contractor shall provide the necessary equipment, vehicles, and <br />personnel for the removal of scrap metal and appliances from the Landfill. <br />4, The Contractor shall remove scrap metal and appliances at a minimum of <br />every two(2) months. <br />5. Payment to the County for the material removed from the Landfill shall <br />be made within 20 days after the date of the removal of the material. <br />6. The initial term of the Contract to be determined by both parties. <br />7. The Contractor has total responsibility for the operation and maintenance <br />of Contractor's equipment and vehicles owned or leased while on County <br />property. While at the Landfill, the Contractor and/or all of his employees <br />shall abide by the rules and regulations governing the operation of the <br />Landfill. <br />Physical Address <br />490 Ansin Road <br />Rockledge, FI. 32955 <br />Mailing Address <br />P.O. Box 562687 Rockledge, R. 32956-2687 <br />(321) 636-2781, Fax: (321) 631-5808 <br />
The URL can be used to link to this page
Your browser does not support the video tag.