My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01311 <br /> CONSTRUCTION SCHEDULES <br /> PART 1 -- GENERAL <br /> 1 .01 REQUIREMENTS INCLUDED <br /> A . Promptly after award of the Contract, Contractor shall prepare and <br /> submit to the Engineer estimated construction progress for the <br /> Work, with sub-schedules of related activities which are essential <br /> to its progress . <br /> B . Coordinate the work and scheduling with and around other <br /> contractors and individual trades performing work on the Project. <br /> C . Submit revised progress schedules with each application for <br /> payment. <br /> D . Progress Schedule shall become part of Contract Documents after <br /> approval by Engineer. <br /> 1902 RELATED REQUIREMENTS <br /> A . In other parts of the Contract Documents : <br /> 1 . General Conditions : <br /> a . Articles 2 and 6 — Schedules , Reports , and <br /> Records <br /> b . Sections 6 . 1 and 6 . 2 — Supervision by Contractor <br /> C , Article 15 — Supervision of Work, Termination , and <br /> Delay <br /> B . Specified in other sections : <br /> 1 . Section 01000 : Summary of Work <br /> 2 , Section 01201 : Preconstruction Conference <br /> 3 , Section 01340 : Shop Drawings , Product Data , and <br /> Samples <br /> 1 .03 FORM OF SCHEDULES <br /> A . Prepare schedules in the form of a horizontal bar chart as follows : <br /> r1 . Provide separate horizontal bar for each trade or operation <br /> 2 . Horizontal time scale : Identify the first work day of each <br /> week. <br /> 1 3 . Scale and spacing : To allow space for notations and <br /> future revisions. <br /> 01311 - 1 <br /> %\Ginny%"pecifications\01311 Constnx ilon Schedules.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.