My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 .04 PRODUCT DATA <br /> A. Preparation : <br /> 1 . Clearly mark each copy to identify applicable products , <br /> models, options , and other data . <br /> 2 . Show performance characteristics and capacities . <br /> 3 . Show dimensions and clearances required . <br /> �. 4 . Show wiring or piping diagrams and controls . <br /> B . Manufacturer' s standard schematic drawings and diagrams: <br /> 1 . Modify drawings and diagrams to delete information which <br /> is not applicable to the work. <br /> 2 . Supplement standard information to provide information <br /> specifically applicable to the work. <br /> 3 . Include manufacturer's installation instructions when <br /> required by the Specifications Section . <br /> 1 .05 SAMPLES <br /> A . Office Samples : Limit to items requiring color, pattern and similar <br /> selections and shall be sufficient size and quantity to clearly <br /> illustrate: <br /> 1 . Full range of color, texture and pattern <br /> 2 . Submit samples for selection of finishes within sixty (60) <br /> days after date of Agreement, or when directed by <br /> Engineer. <br /> B . Field Samples and Mock-ups : <br /> 1 . Functional characteristics of the product, with integrally- <br /> related parts and attachment devices . <br /> 2 . Contractor shall erect, at the Project Site, at a location <br /> acceptable to the Engineer <br /> 3 ' . Size of Area : that specified in the respective specification <br /> section . <br /> 4 . Fabricate each sample and mockup complete and finished . <br /> 5 . Include identification on each sample , giving full <br /> information . <br /> 6 . Remove samples at conclusion of Work , or when <br /> acceptable to the Engineer. <br /> 01340 - 2 <br /> % GinnylelSpedric 0onsW1340 Shop Drawings, Product Data and Samples .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.