My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 06 MANUFACTURER'S CERTIFICATES <br /> A. Submit Certificates, in duplicate , in accordance with requirements <br /> of each specification section . <br /> 1 . 07 CONTRACTOR RESPONSIBILITIES <br /> A . Review Shop Drawings , Product Data and samples prior to <br /> submission . <br /> B . Determine and verify : <br /> 1 . Field measurements <br /> 2 . Field construction criteria <br /> 3 . Catalog numbers and similar data <br /> 4 . Conformance with specifications <br /> C . Coordinate each submittal with requirements of the work and of <br /> the Contract Documents . <br /> D . Notify the Engineer in writing at the time of submission of ANY <br /> AND ALL DEVIATIONS in the submittals from requirements of the <br /> Contract Documents . All of the Contractor' s comments and <br /> notations shall be in red ink. <br /> E . Begin no fabrication of work which requires submittals until return <br /> of submittals with Engineer's approval . <br /> M1 .08 SUBMISSION REQUIREMENTS <br /> A. Make submittals promptly in accordance with approved schedule , <br /> and in such sequence as to cause no delay in the work of any <br /> i` other Contractor. <br /> B . Number of submittals required : <br /> 1 . Shop Drawings: Submit the number of opaque <br /> reproductions which the contractor requires , plus four (4) <br /> copies which will be retained by the Engineer. <br /> 2 , Product Data : Submit the number of copies which the <br /> Contractor requires , plus four (4) which will be retained by <br /> the Engineer. <br /> 3 . Samples: Submit the number stated in each specification <br /> section . <br /> C . Submittals shall contain : <br /> 1 . The date of submission and the dates of any previous <br /> submissions . <br /> 2 . The project title and number <br /> 01340 - 3 <br /> %zinnyleNSpecirications\01340 Shop Drawings, Product Data and Samples .doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.