Laserfiche WebLink
E . Testing Equipment: <br /> ' 1 . Calibrated at reasonable intervals by devices of accuracy <br /> traceable to either: <br /> a . National Bureau of Standards <br /> b . Accepted values of national physical constants . <br /> ' 1 .04 LABORATORY DUTIES <br /> A . Cooperate with Engineer and Contractor; provide qualified <br /> personnel after due notice . <br /> B . Perform specified inspections, sampling , and testing of materials <br /> and methods of construction : <br /> 1 . Comply with specified standards <br /> 2 . Ascertain compliance of materials with requirements of <br /> ' Contract Documents. <br /> C . Promptly notify Engineer and Contractor of observed irregularities <br /> ' or deficiencies of work or products . <br /> D . Promptly submit written report of each test and inspection ; one <br /> copy each to Engineer, Owner, and Contractor, and one copy to <br /> Record Documents File . Each report shall include : <br /> 1 . Date issued <br /> 2 . Project title and number <br /> 3 . Testing laboratory name , address , and telephone number <br /> 4 . Name and signature of laboratory inspector <br /> ' S . Date and time of sampling or inspection <br /> 6 . Record of temperature and weather conditions <br /> 7 . Date of test <br /> 8 . Identification of product and specification section <br /> Wo 9 . Location of sample or test in the Project <br /> 10 . Type of inspection or test <br /> ' 11 . Results of tests and compliance with Contract Documents <br /> 12 . Interpretation of test results , when requested by Engineer <br /> ' E . Perform additional tests as required by Engineer or the Owner <br /> 1 .05 LIMITATIONS OF AUTHORITY OF TESTING LABORATORY <br /> A. Laboratory in not authorized to : <br /> 1 . Release , revoke , alter, or enlarge on requirements of <br /> ' Contract Documents <br /> 2 . Approve or accept any portion of the work <br /> 3 . Perform any duties of the Contractor <br /> ' 01410 - 2 <br /> MGinny%eZpecftationsV01410 Testing Laboratory Services.doc <br />