Laserfiche WebLink
SECTION 01510 <br /> TEMPORARY UTILITIES <br /> ' PART 1 -- GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A . Furnish , install , and maintain temporary utilities required for <br /> ' construction ; remove on completion of entire project. <br /> B . Provide temperature , ventilation , and lighting requirements , if <br /> applicable , as specified in each individual section . <br /> 1 .02 RELATED REQUIREMENTS <br /> ' Section 01000 : Summary of Work <br /> 1 . 03 REQUIREMENTS OF REGULATORY AGENCIES <br /> A. Comply with National Electric Code . <br /> ' B . Comply with federal , state , and local codes and regulations , and <br /> with utility company requirements . <br /> ' PART 2 -- PRODUCTS <br /> 2 .01 MATERIALS (GENERAL ) <br /> ' Materials may be new or used , but must be adequate in capacity for the <br /> required usage . They MUST NOT create unsafe conditions , and MUST <br /> ' NOT violate requirements of applicable codes and standards . <br /> 202 TEMPORARY ELECTRICITY AND LIGHTING <br /> A. The Contractor must maintain power to all existing buildings and <br /> • • areas. <br /> B . The Contractor is responsible for providing and paying for all <br /> power required for his operations . Contractor shall make <br /> arrangements with Owner for temporary power. <br /> ' C . Contractor is responsible for arranging power for his office <br /> trailers(s) , power tools, etc. , at his own expense . The Contractor <br /> shall pay the costs of all power used . <br /> ' 01510 - 1 <br /> UGinny%e%Speafications\01510 Temporary Utilities.doc <br />