My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . Provide POWER CENTERS for miscellaneous tools and <br /> equipment used in the work: <br /> 1 . Weatherproof distribution box with minimum of four 20- <br /> amp . , 120-volt grounded outlets . <br /> 2 . Locate so that power is available at any point of use with <br /> minimum 100-foot CONSTRUCTION-TYPE power cords . <br /> 3 . Provide circuit breaker protection for each outlet. <br /> E . Provide adequate artificial lighting for all areas of work, when <br /> natural light is not adequate for work, and for areas accessible to <br /> ' persons other than Contractor' s employees . <br /> F . If Contractor requires service other than specified above , he shall <br /> arrange for, provide maintenance , and pay all costs incurred . <br /> 2 .03 TEMPORARY WATER <br /> Contractor shall make arrangements with Owner for all temporary water <br /> at the project site . Contractor shall pay for all temporary water required <br /> for his operations. <br /> ' 2 .04 TEMPORARY SANITARY FACILITIES <br /> A. Contractor shall provide temporary sanitary facilities in compliance <br /> with laws and regulations . <br /> B . Contractor shall provide for regular service , cleaning , and <br /> maintenance of temporary facilities and enclosures . <br /> PART 3 -- EXECUTION <br /> ' 3 .01 GENERAL <br /> ' A. Comply with applicable requirements specified in Section 02670 — <br /> Submersible Wastewater Pumping Station , as well as state and <br /> local codes . <br /> B . Maintain and operate systems to ensure continuous service . <br /> 01510 - 2 <br /> ' %%Ginny%e&Specifications\01510 Temporary Wiities .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.