Laserfiche WebLink
SECTION 01560 <br /> TEMPORARY CONTROLS <br /> PART 1 -- GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A . Furnish , install , and maintain temporary control facilities required <br /> for construction ; remove on completion of entire project any <br /> features not intended to remain on the project site . <br /> B . Provide noise control , dust control , water control , debris control , <br /> pollution control and erosion control as specked in the appropriate <br /> sections of these documents . <br /> ' 1 .02 REQUIREMENTS OF REGULATORY AGENCIES <br /> A. Comply with federal , state , and local codes and regulations and <br /> utility company requirements . <br /> B . Comply with Department of Transportation requirements . <br /> PART 2 -- PRODUCTS <br /> ' 2 .01 MATERIALS (GENERAL ) <br /> A. Materials may be new or used , but must be adequate in capacity <br /> ' and quality for the required usage , MUST NOT create unsafe <br /> conditions and MUST NOT violate requirements of applicable <br /> codes and standards . <br /> 2 .02 TEMPORARY NOISE CONTROL <br /> A. Mechanical equipment shall be fitted with mufflers to reduce noise <br /> from internal combustion type engines . <br /> N <br /> B . Bells , sirens , alarms , etc. , shall be adjusted to provide adequate <br /> warnings to personnel on the project site ; however, they shall be <br /> regulated to an intensity that is amenable to the neighboring <br /> communities . <br /> C . Exterior construction work noises shall be kept to a minimum <br /> during evening , night, and early morning hours . In addition , <br /> weekend and holiday noises shall be limited to acceptable levels . <br /> D . In addition to on-site control , noise considerations shall be made <br /> to off-site vehicles and equipment (mobilization , demobilization , <br /> deliveries, etc. ) . <br /> ' 01560 - 1 <br /> \\Ginny\e\Specifica1Jons\01560 Temporary Gontrols.doc <br />