My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
203 TEMPORARY DUST CONTROL <br /> Dust formed as a result of the construction shall be controlled by the <br /> Contractor. Cleaning of work areas and application of dust control <br /> materials are the most effective methods of dust control . <br /> 204 TEMPORARY WATER CONTROL <br /> A. The flow of water through the construction site shall be controlled <br /> by the Contractor such that it does not damage any constructed <br /> items ; however, it shall be diverted and channeled to effectively <br /> leave the site as soon as possible . Puddling and ponding on the <br /> site is not permitted . <br /> B . Water shall be controlled such that it does not enter excavated <br /> areas, nor is deposited on or against constructed features . <br /> 2 .05 TEMPORARY DEBRIS CONTROL <br /> A . Provision shall be made by each Contractor to have available <br /> adequate containers to hold any and all debris that is to be <br /> generated from the project . Containers should be covered to <br /> prevent wind blowing paper, plastic, and lightweight products <br /> around and off the site . <br /> B . Instructions shall be given to personnel to utilize the trash <br /> containers . Containers shall be placed in convenient places at the <br /> site . <br /> C . At least once per week, a thorough cleaning of trash and debris <br /> ' shall be made at the construction site. An acceptable method of <br /> disposal shall be employed . <br /> END OF SECTION <br /> ' 01560 - 2 <br /> \\Ginnyle\Spec1fications\01560 Temporary Controls.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.