My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Document each request with complete data , drawings and <br /> samples as appropriate , substantiating compliance of proposed <br /> substitution with Contract Documents including : <br /> 1 . Comparison of the qualities of the proposed substitution <br /> with the specified . <br /> 2 . Changes required in other elements of the work because <br /> of the substitution . <br /> 3 . Effect on the construction schedule . <br /> 4 . Cost data comparing the proposed substitution with the <br /> product specified . <br /> 5 . Any required license fees or royalties <br /> 6 . Availability of maintenance service , and the source <br /> replacement materials . <br /> C . Request constitutes a representation that Contractor: <br /> 1 . Has investigated proposed product and determined that it <br /> meets or exceeds, in all respects , specified product . <br /> 2 . Will provide the same warranty for substitution as for <br /> specified product. <br /> 3 . Will coordinate installation and make other changes which <br /> may be required for work to be complete in all respects . <br /> 4 . Waives claims for additional costs which may subsequently <br /> become apparent. <br /> D . Substitutions will not be considered when they are indicated or <br /> implied on Shop Drawing or Product Data submittals without <br /> separate written request, or when acceptance will require <br /> substantial revision of Contract Documents . <br /> E . Engineer will review to determine acceptability of proposed <br /> substitution , and will notify Contractor of acceptance or rejection in <br /> writing within a reasonable time . <br /> PART 2 — PRODUCTS <br /> Not applicable <br /> PART 3 -- EXECUTION <br /> Not applicable <br /> END OF SECTION <br /> 01600 - 4 <br /> %\Ginny%e\SpecificationM01600 Material and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.