My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br /> CLEANING <br /> PART 1 -- GENERAL <br /> 1201 REQUIREMENTS INCLUDED <br /> Execute cleaning , during progress of the work , and at completion of the work , as <br /> required by General conditions . <br /> 1 . 02 DISPOSAL REQUIREMENTS <br /> Conduct cleaning and disposal operations to comply with codes , ordinances , <br /> regulations, and anti-pollution laws . <br /> PART 2 -- PRODUCTS <br /> 2 . 01 MATERIALS <br /> A . Use only those cleaning materials which will not create hazards to health <br /> or property and which will not damage finishes and surfaces . <br /> B . Use only those cleaning materials and methods recommended by <br /> manufacturer of the surface material to be cleaned . <br /> C . Use cleaning materials only on surfaces recommended by cleaning <br /> material manufacturer. <br /> aPART 3 -- EXECUTION <br /> 3 . 01 DURING CONSTRUCTION <br /> A. Execute periodic cleaning to keep the work, the site , and adjacent <br /> properties free from accumulation of waste materials , rubbish , and <br /> windblown debris resulting from construction operations . <br /> • B . Dispose of waste materials , cartons , crating , debris , and rubbish at <br /> designated waste receptacles . <br /> C . Contractor shall maintain a broom-cleaned site during the entire <br /> construction phase. <br /> D . For exterior utility work (such as underground pipelines , roadways , <br /> service areas, etc. ) , these shall be cleaned daily . Not less frequently than <br /> ionce weekly . Roadways shall be mechanically broomed . <br /> 01710 - 1 <br /> Winny%"pecirrodionMOMO Cleaning.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.