My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . 02 <br /> DUST CONTROL <br /> A . General Contractor shall broom-clean interior spaces prior to the start of <br /> completing painting and continue cleaning on an as-needed basis until <br /> painting is finished . <br /> B . Schedule operations so that dust and other contaminants resulting from <br /> the cleaning process will not fall on wet or newly-coated surfaces . <br /> 3 .03 FINAL CLEANING <br /> A . Remove grease , mastic , adhesives , dust , dirt , stains , fingerprints , labels , <br /> and other foreign materials . <br /> B . Contractor shall broom-clean paved surface ; rake-clean other surfaces of <br /> the grounds . <br /> C . Prior to final completion , Contractor shall conduct an inspection of all <br /> work areas to verify that the entire work area is clean . <br /> END OF SECTION <br /> 01710 - 2 <br /> 1Ginny%MSpedficai:ions101710 Creaning.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.