Laserfiche WebLink
12 . All Utility As-built construction located withing one mile of the <br /> Indian River County Global Positioning System (G . P . S . ) control <br /> project shall be tied from that nearest G . P . S . point and into the <br /> closest construction site Permanent Reference Monument <br /> (P . R . M . ) , if available . This does not eliminate Item No . 7 above . <br /> 13 . All as-builts shall clearly depict as-built utility lines that were <br /> constructed along with all easements . As-builts will not be <br /> accepted unless the verbiage " PROPOSED" and/or "TO BE <br /> CONSTRUCTED" have been revised to read "AS-BUILT . " <br /> Construction drawings with construction terminology will not be <br /> accepted . <br /> PART 2 -- PRODUCTS <br /> Not applicable <br /> PART 3 -- EXECUTION <br /> Not applicable <br /> END OF SECTION <br /> 01720 - 4 <br /> %1GinnyWpecificatiorrM01720 Project Record Documents.doc <br />