Laserfiche WebLink
2. 1 . 1 . Mobilization (Cont' dl <br /> Should the Lump Sum price bid for the item Mobilization exceed the maximum permissible <br /> amount for this item, as specified herein, the bid price will be reduced to the maximum <br /> permissible amount, and the reduced price will be used in correctly determining the total price for <br /> comparison of bids received. <br /> 2. 1 .2 . Clearing Site <br /> Description: <br /> Clearing site shall consist of the work of clearing the site of the project within the limits <br /> specified, including the removal and resetting of street and road signs, mail boxes, bushes and <br /> shrubs, resetting fences, removal of trees, grubbing and removal of all other material or <br /> obstruction necessary for the proper construction of the Project. <br /> Materials <br /> No materials are involved. <br /> Method of Construction <br /> The site of the project shall be cleared within the limits of construction including the removal of <br /> all trees, brush, weeds, roots, stumps, matted leaves, small structures, debris, and other unsuitable <br /> matter, except as otherwise hereinafter provided or as noted on the Contract Plans. Trees, <br /> shrubs, and other landscape features within the limits of construction which do not interfere with <br /> the Project and are shown on the plans or designated by the Engineer for preservation shall not be <br /> removed, but shall be protected during the progress of the work in a manner satisfactory to the <br /> Engineer and shall be trimmed of overhanging branches at the direction to the Engineer. <br /> All dead trees and those which die during the life of the Contract remaining after clearing site <br /> shall be removed. Such removals shall be part of the work included in site clearing. <br /> In performance of clearing site, the Contractor shall be responsible for the preservation of all <br /> public and private property, existing trees, plants and other vegetation that are to remain within <br /> or adjacent to the project and shall use every precaution necessary to prevent damage or injury <br /> thereto . The Contractor shall repair all injuries to bark, trunk, limbs and roots of remaining <br /> plants by properly dressing, cutting, tracing and painting, using only approved tree surgery <br /> methods, tools and material, and shall replace to their original condition by approved seeding <br /> methods and materials, all grass areas beyond the limits of construction which have been <br /> damaged by his work. The Contractor shall not remove, cut, injure or destroy trees or shrubs <br /> ' outside the limits of construction without authority of the Engineer. <br /> 2 <br />