My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r2.2.4 . Brine Main <br /> Polvvinxl Chloride Pipe (Cont'd) <br /> PVC pipe shall be homogeneous throughout and free from visible cracks, holes, foreign <br /> inclusions, or other injurious defects. The pipe shall be as uniform as commercially practical in <br /> color, opacity, density and other physical properties . The pipe shall be white in color. <br /> All Brine Main pipe shall be compression ring, push on type joints conforming with applicable <br /> AWWA Specifications . No solvent, weld or threaded joints will be permitted. <br /> Pipe Fittings <br /> All underground fittings shall be restrained point conforming to ANSI Specifications A21 . 11 for <br /> 250 psi pressure (gray iron or ductile iron) unless otherwise specified or noted. <br /> In making the joint, the surface with which the rubber gasket comes in contact shall be brushed <br /> thoroughly with a wire brush just prior to assembly to remove all loose rust or foreign material, <br /> and to provide clean surfaces, which should be brushed with soapy water, just prior to slipping <br /> the gasket over the spigot end and into the bell. Brush soapy water over the gasket, prior to <br /> ' installation, to remove loose dirt, and lubricate the gasket as it is forced into its retaining space . <br /> The sequence of assembly is to be as follows : The gland, followed by the rubber gasket, is to be <br /> placed over the spigot end, which is inserted into the socket. The gasket should be pushed in <br /> position so that it is evenly seated in the socket. The gland is then moved into position against <br /> the face of the gasket. Bolts are then to be inserted and made finger tight. <br /> ' When tightening bolts, it is essential that the gland be brought toward the pipe flange evenly, <br /> maintaining approximately the same distance between the gland and the face of the flange at all <br /> points around the socket. This may be done by partially tightening the bottom bolt first, then the <br /> top bolt, next the bolt at either side, and last, the remaining bolts. This cycle is to be repeated <br /> until all bolts are within the following range of bolt torque: <br /> it <br /> e rif KTq ' ueELMYze . .. _ . eddec `._ + f Wrench <br /> 3 .4" 60' — 90 lbs. 3/4 " 10 " <br /> The above torque load may be applied with the torque measuring or indicating wrench, length of <br /> wrench recommended above. If effective sealing is not attained at the maximum torque indicated <br /> above, the joint should be disassembled and reassembled after thorough cleaning. Overstressing <br /> of bolts to compensate for poor installation shall be avoided. <br /> All underground fittings shall be restrained joint conforming to ANSI Specifications A21 . 11 . All <br /> fittings on PVC pipe shall be restrained with 1300 series retainer glands . <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.