Laserfiche WebLink
2.2 . 9. Audio-Video Taping <br /> Equipment Cont' d) <br /> Tape coverage shall include all surface features located within the zone of influence of <br /> construction supported by appropriate audio coverage. Such coverage shall include, but not be <br /> limited to, existing driveways, sidewalks, curbs, pavements, ditches, mailboxes, landscaping, <br /> culverts, fences, signs and headwalls within the area covered. <br /> �1 2.2. 10. Air Release Valves <br /> Description <br /> Air release valves and valve joint shall include the furnishing and installation of air release valve <br /> with valve vault in the Brine main system in accordance with these specifications and in <br /> reasonably close conformity to the locations shown on the plans or as directed by Indian River <br /> County Utility Department or by the Engineer. <br /> Materials <br /> Air release valves shall be as manufactured by AIR, Model #ARI-D=025P. The 2" diameter <br /> valve vault shall be manufactured by CDR and shall be 4 ' x 3 ' x 3 ' . <br /> 31 <br />