Laserfiche WebLink
36. Radioactive Mateda/ ,Souroe, special nuclear, or <br /> 23. Hazardous Environmental Condition The byproduct material as defined by the Atomic Energy Act of 1954 <br /> presence at the Site of Asbestos, PCBs, Petroleum, Hazardous (42 USC Section 2011 et seq. ) as amended from time to time. <br /> Waste, or Radioactive Material in such quantities or <br /> ' circumstances that may present a substantial danger to persons 37. Resident Pried RepresentaUve-The authorized <br /> or property exposed thereto in connection with the Work. representative of ENGINEER who may be assigned to the Site <br /> or any part thereof. <br /> 24. Hazardous Waste-The term Hazardous Waste <br /> ' shall have the meaning provided in Section 1004 of the Solid 38. Samples-Physical examples of materials, <br /> Waste Disposal Act (42 USC Section 6903) as amended from equipment, or workmanship that are representative of some <br /> time to time. portion of the Work and which establish the standards by which <br /> such portion of the Work will be judged. <br /> 25. Laws and Regulations; Laws or Regulations-Any <br /> and all applicable laws, rules, regulations, ordinances, codes, 39. Shop Drawings-All drawings, diagrams, illustra- <br /> and orders of any and all governmental bodies, agencies, tions, schedules, and other data or information <br /> which are <br /> authorities, and courts having jurisdiction. specifically prepared or assembled by or for CONTRACTOR <br /> and submitted by CONTRACTOR to illustrate some portion of <br /> ' 26. Liens-Charges, security interests, or the Work. <br /> encumbrances upon Project funds, real property, or personal <br /> property. 40. Site-Lands or areas indicated in the Contract <br /> Documents as being furnished by OWNER upon which the <br /> ' 27. M&Wbne-A principal event specified in the Work is to be performed, including rights-of-way and easements <br /> Contract Documents relating to an intermediate completion date for access thereto, and such other lands furnished by OWNER <br /> or time prior to Substantial Completion of all the Work which are designated for the use of CONTRACTOR. <br /> 28. Notice of Award ..The written notice by OWNER 41 . Speafftca6ons-That part of the Contract <br /> to the apparent successful bidder stating that upon timely Documents consisting of written technical <br /> descriptions of <br /> compliance by the apparent successful bidder with the materials, equipment, systems, standards, and workmanship as <br /> conditions precedent fisted therein, OWNER will sign and applied to the Work and certain administrative details applicable <br /> ' deliver the Agreement. thereto. <br /> 29. Notice to Proceed-A written notice given by 42. Subcontractor-An individual or entity having a <br /> OWNER to CONTRACTOR fixing the date on which the direct contract with CONTRACTOR or with any other <br /> ' Contract Times will commence to run and on which Subcontractor for the performance of a part of the Work at the <br /> CONTRACTOR shall start to perform the Work under the Site. <br /> Contract Documents. <br /> 43, Substantial Completion-The time at which the <br /> 30. OWNER-The individual, entity, public body, or Work (or a specified part thereof) has progressed to the point <br /> authority with whom CONTRACTOR has entered into the where, in the opinion of ENGINEER, the Work (or a <br /> specified <br /> Agreement and for whom the Work is to be performed. part thereof) is sufficiently complete, in accordance with the <br /> Contract Documents, so that the Work (or a specified part <br /> 31 . Partial Utilization-Use by OWNER of a substan- thereof) can be ubbed for the purposes for which it is intended. <br /> tially completed part of the Work for the purpose for which it is The terms `substantially complete and "substantially <br /> intended (or a related purpose) prior to Substantial Completion completed" as applied to all or part of the <br /> Work refer to <br /> of all the Work. Substantial Completion thereof. <br /> ' 32. PCBs-Polychlorinated biphenyls. 44. Supplementary Conditions-That part of the <br /> Contract Documents which amends or supplements these <br /> 33. Petroleum--Petroleum, including crude oil or any General Conditions. <br /> ' fraction thereof which is liquid at standard conditions of <br /> temperature and pressure (60 degrees Fahrenheit and 14.7 45. Supplier-A manufacturer, fabricator, supplier, <br /> pounds per square inch absolute), such as oil, petroleum, fuel distributor, materialman, or vendor having a direct contract with <br /> oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with CONTRACTOR or with any Subcontractor to furnish materials <br /> other non-Hazardous Waste and crude oils. or equipment to be incorporated in the Work by CONTRACTOR <br /> or any Subcontractor. <br /> 34. Prg0d The total constriction of which the Work <br /> to be performed under the Contract Documents may be the 46. Underground Facilities- All underground <br /> whole, or a part as may be indicated elsewhere in the Contract pipelines, conduits, ducts, cables, wires, manholes, <br /> vaults, <br /> ' Documents. tanks, tunnels, or other such facilities or attachments, and any <br /> encasements containing such facilities, including those that <br /> 35. Project Manual-The bound doc urnentary convey electricity, gases, steam, liquid petroleum products, <br /> information prepared for bidding and constructing the Work. A telephone or other communications, cable television, <br /> water, <br /> ' listing of the contents of the Project Manual, which may be wastewater, storm water, other liquids or chemicals, or traffic <br /> or <br /> bound in one or more volumes, is contained in the table(s) of other control systems. <br /> contents. <br /> 00700 - 6 <br />