47. Unit Price Work Work to be paid for on the basis inspection, reference standard, test, or approval
<br /> of unit prices. referred to in the - Contract Documents, or has been
<br /> damaged prior to ENGINEER's recommendation of final
<br /> 48. Work—The entire completed constriction or the payment (unless responsibility for the protection thereof
<br /> ' various separately identifiable parts thereof required to be has been assumed by OWNER at Substantial
<br /> provided under the Contract Documents. Work incudes and is Completion in accordance with paragraph 14.04 or
<br /> the result of performing or providing all labor, services, and 14.05).
<br /> documentation necessary to produce such construction, and
<br /> L furnishing, installing, and incorporating all materials and D. Furnish, Install, Perform, Provide
<br /> equipment into such construction, all as required by the
<br /> Contract Documents. 1 .The word Yumish,' when used in connection with
<br /> services, materials, or equipment, shall mean to supply
<br /> 49. Work Change Directive A written statement to and deliver said services, materials, or equipment to the
<br /> CONTRACTOR issued on or after the Effective Date of the Site (or some other specified location) ready for use
<br /> or
<br /> Agreement and signed by OWNER and recommended by installation and in usable or operable condition.
<br /> ENGINEER ordering an addition, deletion, or revision in the
<br /> Work or responding to differing or unforeseen subsurface or 2.The word "install; when used in connection with
<br /> ' physical conditions under which the Work is to be performed or services, materials, or equipment, shall mean to put into
<br /> to emergencies. A Work Change Directive will not change the use or place in final position said services, materials, or
<br /> Contract Price or the Contract Times but is evidence that the equipment complete and ready for intended use.
<br /> parties expect that the change ordered or documented by a
<br /> ' Work Change Directive will be incorporated in a subsequently 3.The words "perform" or "provide," when used in
<br /> issued Change Order following negotiations by the parties as to connection with services, materials, or equipment shall
<br /> its effect, if any, on the Contract Price or Contract Times. mean to furnish arid . install said services, materials, or
<br /> equipment complete and ready for intended use.
<br /> 50. Written Amendment—A written statement
<br /> modifying the Contract Documents, signed by OWNER and 4. When 'furnish," "install; 'perform," or "Provide' is
<br /> CONTRACTOR on or atter the Effective Date of the Agreement not used in connection with services, materials, or
<br /> and normally dealing with the non-engineering or non-technical equipment in a context dearly requiring an obligation
<br /> of
<br /> ' rather than strictly construction-related aspects of the Contract CONTRACTOR, "provide" is implied.
<br /> Documents.
<br /> E. Unless stated otherwise in the Contrail Documents,
<br /> 1 .02 Terminology words or phrases which have a well-known technical or
<br /> construction industry or trade meaning are used in the Contract
<br /> A. Intent of Certain Terms orAdjectAos Documents in accordance with such recognized meaning.
<br /> 1 . Whenever in the Contract Documents the terms
<br /> "as allowed," "as approved," or terns of like effect or import ARTICLE 2 - PRELIMINARY MATTERS
<br /> are used, or the adjectives "reasonable," "suitable;
<br /> "acceptable; "proper," "satisfactory," or adjectives of like
<br /> effect or import are used to describe an action or 2. 01 Delivery of Bonds
<br /> determination of ENGINEER as to the Work it is intended
<br /> that such action or determination will be solely to evaluate, A. When CONTRACTOR delivers the executed
<br /> in general, the completed Work for compliance with the Agreements to OWNER, CONTRACTOR shall also deliver to
<br /> requirements of and information in the Contract Documents OWNER such Bonds as CONTRACTOR may be required to
<br /> and conformance with the design concept of the completed furnish.
<br /> Project as a functioning whole as shown or indicated in the
<br /> . Contract Documents (unless there is a specific statement 2.02 Copies of Documents
<br /> Indicating otherwise). The use of any such term or adjective
<br /> shall not be effective to assign to ENGINEER any duty or A. OWNER shall furnish to CONTRACTOR up to ten
<br /> ' authority to supervise or direct the performance of the Work copies of the Contract Documents. Additional copies will be
<br /> or any duty or authority to undertake responsibility contrary furnished upon request at the cost of reproduction.
<br /> to the provisions of paragraph 9. 10 or any other provision of
<br /> the Contrad Documents. 2.03 Commencement of Contract Times; Notice to
<br /> Proceed
<br /> B. Day
<br /> A. The Contract Times will commence to run on the
<br /> 1 .The word "day" shall constitute a calendar day of thirtieth day after the Effective Date of the Agreement or, if
<br />a
<br /> ' 24 hours measured from midnight to the next midnight. Notice to Proceed is given, on the day indicated in the Notice to
<br /> Proceed. A Notice to Proceed may be given at any time within
<br /> C. Defecctim 30 days after the Effective Date of the Agreement In no even
<br /> will the Contract Times commence to run later than the sixtieth
<br /> ' 1 .The word "defective," when modifying the word day after the day of Bid opening or the thirtieth day after
<br /> the
<br /> "Worts,' refers to Work that is unsatisfactory, faulty, or Effective Date of the Agreement, whichever date is earlier.
<br /> deficient in that it does not conform to the Contrad
<br /> Documents or does not meet the requirements of any
<br /> '