My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 2.04 Starting the Work <br /> 2.07 Initial Acceptance of Schedules <br /> A. CONTRACTOR shall start to perform the Work on the <br /> date when the Contract Times commerce to run. No Work A. Unless otherwise provided in the Contract Docu- <br /> shall be done at the Site prior to the date on which the Contract merits, at least ten days before submission <br /> of the first <br /> ' Times commence to run. Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropriate will be <br /> 2. 05 Before Starting Construction held to review for acceptability to ENGINEER as provided below <br /> L <br /> the schedules submitted in accordance with paragraph 2.05.B.A. CONTRACTOR's Review of Contract Documents: <br /> CONTRACTOR shall have an additional ten days to make <br /> Before undertaking each part of the Work, CONTRACTOR shall corrections and adjustments and to complete and resubmit the <br /> carefully study and compare the Contract Documents and schedules. No progress payment shall be made to <br /> check and verify pertinent figures therein and all applicable field CONTRACTOR until acceptable schedules are submitted to <br /> measurements. CONTRACTOR shall promptly report in writing ENGINEER. <br /> to ENGINEER any oonflict, error, ambiguity, or discrepancy <br /> which CONTRACTOR may discover and shall obtain a written 1 -The progress schedule will be acceptable to <br /> interpretation or clarification from ENGINEER before proceeding ENGINEER if it provides an orderly progression of the <br /> ' with any Work affected thereby; however, CONTRACTOR shall Work to completion within any specified Milestones and <br /> not be liable to OWNER or ENGINEER for failure to report any the Contract Times. Such acceptance will not impose <br /> conflict, error, ambiguity, or discrepancy in the Contract on ENGINEER responsibility for the progress schedule, <br /> Documents unless CONTRACTOR knew or reasonably should for sequencing , scheduling, or progress of the Work nor <br /> have known thereof. interfere with or relieve CONTRACTOR from <br /> CONTRACTOR'S full responsibility therefore. <br /> B. Preliminary Schedules: Within ten days after the <br /> Effective Date of the Agreement (unless otherwise specified in 2.CONTRACTOR's schedule of Shop Drawing and <br /> the General Requirements), CONTRACTOR shall submit to Sample submittals will be acceptable to ENGINEER if it <br /> ENGINEER for its timely review: provides a workable arrangement for reviewing and <br /> processing the required submittals. <br /> 1 .a preliminary progress schedule indicating the <br /> times (numbers of days or dates) for starting and 3.CONTRACTOR's schedule of values will be <br /> completing the various stages of the Work, including acceptable to ENGINEER as to form and substance if it <br /> any Milestones specified in the Contract Documents; provides a reasonable allocation of the Contract Price to <br /> component parts of the Work. <br /> 2. a preliminary schedule of Shop Drawing and <br /> Sample submittals which will list each required submittal <br /> and the times for submitting, reviewing, and processing ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, <br /> such submittal; and AMENDING, REUSE <br /> 3. a preliminary schedule of values for all of the <br /> Work which incudes quantities and prices of items 3. 01 Intent <br /> which when added together equal the Contract Price <br /> and subdivides the Work into component parts in A. The Contract Documents are complementary; what <br /> sufficient detail to serve as the basis for progress is called for by one is as binding as if called for by all. <br /> payments during performance of the Worts. Such prices <br /> will include an appropriate amount of overhead and B. It is the intent of the Contract Documents to describe <br /> profit applicable to each item of Work. a functionally complete Project (or part thereof) to be <br /> constructed in accordance with the Contract Documents. Any <br /> . C. Evidence of Insurance: Before any Work at the Site is labor, documentation, services, materials, or equipment that <br /> started, CONTRACTOR and OWNER shall each dernrer to the may reasonably be inferred from the Contract Documents or <br /> other, with copies to each additional insured identified in the frau prevailing custom or trade usage as being <br /> required to <br /> ' Supplementary Conditions, certificates of insurance (and other produce the intended result will be provided whether <br /> or not <br /> evidence of insurance which either of them or any additional specifically called for at no additional cost to OWNER. <br /> insured may reasonably request) which CONTRACTOR and <br /> OWNER respectively are required to purchase and maintain in C. Clarifications and interpretations of the Contract <br /> ' accordance with Article 5 Documents shall be issued by ENGINEER as provided in Article <br /> 9. <br /> 2.06 Preoonstruction Conference <br /> 3.02 Reference Standards <br /> A. Within 20 days after the Contract Times start to run, <br /> but before any Work at the Site is started, a conference A. Standards, Specifications, Codes, Laws, <br /> and <br /> attended by CONTRACTOR, ENGINEER, and others as Regulations <br /> appropriate will be held to establish a working understanding <br /> among the parties as to the Work and to discuss the schedules 1 . Referenoe to standards, specifications, manuals, <br /> ' referred to in paragraph 2.05.13, procedures for handling Shop or codes of any technical society, organization, <br /> or . <br /> Drawings and other submittals, processing Applications for association, or to Laws or Regulations, whether <br /> such <br /> Payment, and maintaining required records. reference be specific or by implication, shall mean the <br /> ' 00700 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.