Laserfiche WebLink
' standard, specification , manual, code, or Laws or the terms and conditions thereof in one or more of the <br /> following <br /> Regulations in effect at the time of opening of Bids (or ways: (i) a Written Amendment; (ii) a Change Oilier, or (iii) <br /> a <br /> on the Effective Date of the Agreement if there were no Work Change Directive. <br /> Bids), except as may be otherwise specifically stated in <br /> ' the Contract Documents. B. The requirements of the Contract Documents may be <br /> supplemented, and minor variations and deviations in the Work <br /> 2. No provision of any such standard, specification, may be authorized, by one or more of the following ways: (i) a <br /> manual or code, or any instruction of a Supplier shall be Field Order, (ii) ENGINEER's approval of a Shop Drawing or <br /> effective to change the duties or responsibilities of Sample; or (iii) ENGINEER's written interpretation or <br /> OWNER, CONTRACTOR, or ENGINEER, or any of clarification. <br /> their subcontractors, consultants, agents, or employees <br /> from those set forth in the Contract Documents, nor 3.05 Reuse of Documents <br /> shall any such provision or instruction be effective to <br /> assign to OWNER, ENGINEER, or any of ENGINEER's A CONTRACTOR and any Subcontractor or Supplier or <br /> Consultants, agents, or employees any duty or authority other individual or entity performing or furnishing any of the <br /> to supervise or direct the performance of the Work or Work under a direct or indirect contract with OWNER: (i) shall <br /> any duty or authority to undertake responsibility not have or acquire any title to or ownership rights in any of the <br /> inconsistent with the provisions of the Contract Drawings, Specifications, or other documents (or copies of any <br /> Documents. thereof) prepared by or bearing the seal of ENGINEER or <br /> ENGINEER's Consultant, including electronic media editions; <br /> 3.03 Reporting and Resolving Discrepancies and (ii) shall not reuse any of such Drawings, Specifications, <br /> ' other documents, or copies thereof on extensions of the Project <br /> A. Reporting Discrepancies or any other project without mitten consent of OWNER and <br /> ENGINEER and specific written verification or adaption by <br /> 1 . If, during the performance of the Work, ENGINEER. This prohibition will survive final payment, <br /> CONTRACTOR discovers any conflict, error, ambiguity, completion, and acceptance of the Work, or termination or <br /> or discrepancy within the Contract Documents or completion of the Contract. Nothing herein shall <br /> preclude <br /> between the Contract Documents and any provision of CONTRACTOR from retaining copies of the Contract <br /> any Law or Regulation applicable to the performance of Documents for record purposes. <br /> ' the Work or of any standard, specification, manual or <br /> code, or of any instruction of any Supplier, <br /> CONTRACTOR shall report it to ENGINEER in writing ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND <br /> at once. CONTRACTOR shall not proceed with the PHYSICAL CONDITIONS; REFERENCE POINTS <br /> Work affected thereby (except in an emergency as <br /> required by paragraph 6. 16A) until an amendment or <br /> supplement to the Contract Documents has been 4.01 Avaiiability of Lands <br /> issued by one of the methods indicated in paragraph <br /> 3.04; provided, however, that CONTRACTOR shall not A. OWNER shall furnish the Site. OWNER shall notify <br /> be liable to OWNER or ENGINEER for failure to report CONTRACTOR of any encumbrances or restrictions not of <br /> any such conflict, error, ambiguity, or discrepancy general application but specifically related to use of the Site <br /> with <br /> unless CONTRACTOR knew or reasonably should have which CONTRACTOR must comply in performing the Work. <br /> known ftreof OWNER will obtain in a timely manner and pay for easements <br /> for permanent structures or permanent changes in existing <br /> B. ResoMng Discmpancies facilities. If CONTRACTOR and OWNER are unable to agree <br /> on entitlement to or on the amount or extent, if any, of any <br /> 1 , Except as may be otherwise specifically stated in adjustment in the Contract Price or Contract Times, or both, as <br /> the Contrad Documents, the provisions of the Contract a result of any delay in OWNER's furnishing <br /> the Site, <br /> Documents shall take precedence in resolving any CONTRACTOR may make a Claim therefore as provided in <br /> conflict error, ambiguity, or discrepancy between the paragraph 10.05. <br /> provisions of the Contract Documents and: <br /> B. Upon reasonable written request, OWNER shall <br /> a. the provisions of any standard, specification, fumish CONTRACTOR with a current statement of record legal <br /> manual, code, or instruction (whether or not title and legal description of the lands upon which the Work is to <br /> specifically incorporated by reference in the be perfomred and OWNER's interest therein as necessary for <br /> ' Contract Documents); or giving notice of or filing a mechanic's or construction lien against <br /> such lands in accordance with applicable Laws and <br /> b. the provisions of any Laws or Regulations Regulations. <br /> applicable to the performance of the Work (unless <br /> such an interpretation of the provisions of the C. CONTRACTOR shall provide for all additional lands <br /> Contract Documents would result in violation of and access thereto that may be required <br /> for temporary <br /> such Law or Regulation). construction facilities or storage of materials and equipment. <br /> 3.04 Amending and Supplementing Contract Documents 4.02 Subsurface and Physical Conditions <br /> A The Contract Documents may be amended to provide A Reports and Drawings. The Supplementary <br /> for additions, deletions, and revisions in the Work or to modify Conditions identify: <br /> ' 00700 - 9 <br /> r <br />