Laserfiche WebLink
perform any Work in connection therewith (except as aforesaid) <br /> 1 .those reports of explorations and tests of until receipt of written order-to do so. <br /> subsurface conditions at or contiguous to the Site that <br /> ENGINEER has used in preparing the Contract B. ENGINEER's Review, After receipt of written notice <br /> ' Documents; and as required by paragraph 4.03.A, ENGINEER will promptly <br /> review the pertinent condition, determine the necessity of <br /> 2. those drawings of physical conditions in or OWNER's obtaining additional exploration or tests with respect <br /> relating to existing surface or subsurface structures at or thereto, and advise OWNER in writing (with a <br /> copy to <br /> contiguous to the Site (except Underground Facilities) CONTRACTOR) of ENGINEER's findings and conclusions. <br /> that ENGINEER has used in preparing the Contrail <br /> Documents C. Passible Price and Times Adjustments <br /> B. limited Reliance by CONTRACTOR on Technical 1 . The Contract Price or the Contract Tines, or <br /> ' Data Auttwrized: CONTRACTOR may rely upon the general both, will be equitably adjusted to the extent that the <br /> accuracy of the 'technical data" contained in such reports and existence of such differing subsurface or physical <br /> drawings, but such reports and drawings are not Contract condition causes an increase or decrease in <br /> Documents. Such `technical data' is identified in the CONTRACTOR s cost of, or time required for, <br /> ' Supplementary Conditions. Except for such reliance on such performance of the Work; subject, however, to the <br /> 'teclmnical data," CONTRACTOR may not rely upon or make following: <br /> any Claim against OWNER, ENGINEER, or any of <br /> ENGINEER's Consultants with respect to: a. such condition must meet any one or more <br /> of the categories described in paragraph 4.03A; <br /> i .the completeness of such reports and drawings and <br /> for CONTRACTOR's purposes, including, but not <br /> limited to, any aspects of the means, methods, b. with respect to Work that is paid for on a <br /> techniques, sequences, and procedures of construction Unit Price Basis, any adjustment in Contract Price <br /> to be employed by CONTRACTOR, and safety will be subject to the provisions of paragraphs 9.08 <br /> precautions and programs incident thereto; or and 11 .03. <br /> 2. other data, interpretations, opinions, and 2. CONTRACTOR shall not be entitled to any <br /> information contained in such reports or shown or adjustment in the Contract Price or Contract Times it <br /> indicated in such drawings; or <br /> a. CONTRACTOR knew of the existence of <br /> 3.any CONTRACTOR interpretation of or such conditions at the time CONTRACTOR made a <br /> conclusion drawn from any "technical data" or any such final commitment to OWNER in respect of Contract <br /> other data, interpretations, opinions, or information. Price and Contrail Times by the submission of a <br /> Bid or becoming bound under a negotiated contract; <br /> 4.03 Differing Subsurface or Physical Conditions or <br /> A. Notice; If CONTRACTOR believes that any b. the existence of such condition could <br /> subsurface or physical condition at or contiguous to the Site that reasonably have been discovered or revealed as a <br /> I ur> cceeredor � either result of any examination, investigation, exploration, <br /> test, or study of the Site and contiguous areas <br /> 1 . is of such a nature as to establish that any required by the Bidding Requirements or Contract <br /> "technical data" on which CONTRACTOR is entitled to Documents to be conducted by or for <br /> rely as provided in paragraph 4.02 is materially CONTRACTOR prior to CONTRACTOR's making <br /> inaccurate; or such final commitment or <br /> 2. is of such a nature as to require a change in the c. CONTRACTOR failed to give the written <br /> Contract Documents; or notice within the time and as required by paragraph <br /> 4.03.A. <br /> 3.differs materially from that shown or indicated in <br /> the Contrail Documents; or 3. I1' OWNER and CONTRACTOR are unable to <br /> agree on entitlement to or on the amount or extent, if <br /> 4. is of an unusual nature, and differs materially from any, of any adjustment in the Contract Price <br /> or Contrail <br /> conditions ordinarily encountered and generally recognized as Times, or both, a Claim may be made therefore <br /> as <br /> inherent in work of the character provided for in the Contract provided in paragraph 10.05. However, <br />OWNER, <br /> Documents; ENGINEER, and ENGINEER's Consultants shall not be <br /> ' liable to CONTRACTOR for any claims, costs, losses, <br /> then CONTRACTOR shall, promptly after becoming aware or damages (including but not limited to all fees <br /> and <br /> thereof and before further disturbing the subsurface or physical charges of engineers, architects, attorneys, and other <br /> conditions or performing any Work in connection therewith professionals and all court or arbitration or other dispute <br /> (except in an emergency as required by paragraph 6. 16A), resolution costs) sustained by CONTRACTOR on or in <br /> notify OWNER and ENGINEER in writing about such condition, connection with any other project or anticipated per• <br /> CONTRACTOR shall not further disturb such condition or <br /> 00700 - 10 <br /> r <br />