Laserfiche WebLink
4.04 Underground Facilities on the amount or extent, if any, of any such adjustment <br /> ' in Contract Price or Contract Times, OWNER or <br /> A. Shown or indicated.• The information and data shown CONTRACTOR may make a Claim therefore as <br /> or indicated in the Contract Documents with respect to existing provided in paragraph 10.05. <br /> Underground Facilities at or contiguous to the Site is based on <br /> information and data furnished to OWNER or ENGINEER by 4.05 Reference Points <br /> the owners of such Underground Facilities, including OWNER, <br /> or by others. Unless it is otherwise expressly provided in the A. OWNER shall provide engineering surveys to <br /> Supplementary Conditions: establish reference points for oonstructionwhich in ENGINEER's <br /> ' judgment are necessary to enable CONTRACTOR to proceed <br /> 1 . OWNER and ENGINEER shall not be with the Work CONTRACTOR shall be responsible for laying <br /> responsible for the accuracy or completeness of any out the Work, shall protect and preserve the <br />established <br /> such information or data; and reference points and property monuments, and shall make no <br /> changes or relocations without the prior written approval of <br /> 2.the cost of all of the following will be included in OWNER. CONTRACTOR shall report to ENGINEER whenever <br /> the Contract Price, and CONTRACTOR shall have full any reference pant or property monument is lost or destroyed <br /> responsibility for or requires relocation because of necessary changes in grades <br /> or locations, and shall be responsible for the accurate <br /> a. reviewing and checking all such information replacement or relocation of such reference points or property <br /> and data, monuments by professionally qualified personnel. <br /> b. locating all Underground Facilities shown or 4.06 Hazardous Environmental Condition at Site <br /> indicated in the Contract Documents, <br /> A. Repots and Drawings: Reference is made to the <br /> c, coordination of the Work with the owners of Supplementary Conditions for the identification of those reports <br /> such Underground Facilities, including OWNER, and drawings relating to a Hazardous Environmental Condition <br /> during construction, and identified at the Site, if any, that have been utilized by the <br /> ENGINEER in the preparation of the Contract Documents. <br /> d. the safety and protection of all such <br /> Underground Facilities and repairing any damage B. Limited Reliance by CONTRACTOR on Technical <br /> thereto resulting from the Work. Data Authorized: CONTRACTOR may rely upon the general <br /> accuracy of the "technical data" contained in such reports and <br /> B. Not Shown or Indicated drawings, but such reports and drawings are not Contract <br /> ' Documents. Such 'technical data" is identified in the <br /> 1 .I1' an Underground Facility is uncovered or Supplementary Conditions. Except for such reliance on <br /> such <br /> revealed at or contiguous to the Site which was not 'technical data,' CONTRACTOR may not rely upon or make <br /> shown or indicated, or not shown or indicated with any Claim against OWNER, ENGINEER or any of ENGINEER's <br /> ' reasonable accuracy in the Contract Documents, Consultants with respect to: <br /> CONTRACTOR shall, promptly after becoming aware <br /> thereof and before further disturbing conditions affected 1 . the completeness of such reports and drawings <br /> thereby or performing any Work in connection therewith for CONTRACTOR's purposes, inducting, but not <br /> (except in an emergency as required by paragraph limited to, any aspects of the means, methods, <br /> �. 6. 16A), identity the owner of such Underground Facility techniques, sequences and procedure; of construction <br /> and give written notice to that owner and to OWNER to be employed by CONTRACTOR and safety <br /> and ENGINEER. ENGINEER will promptly review the precautions and programs incident thereto; or <br /> Underground Facility and determine the exteK if any, to <br /> which a change is required in the Contract Documents 2.other data, interpretations, opinions and <br /> to reflect and document the consequences of the information contained in such reports or shown <br /> or <br /> existence or location of the Underground Facility. Indicated in such drawings; or <br /> During such time, CONTRACTOR shall be responsible <br /> for the safety and protection of such Underground 3. any CONTRACTOR interpretation of or <br /> Facility. conclusion drawn from any "technical data" or any such <br /> other data, interpretations, opinions or information. <br /> 2. If ENGINEER concludes that a change in the <br /> Contract Documents is required, a Work Change C. CONTRACTOR shall not be responsible for <br />any <br /> Directive or a Change Order will be issued to reflect and Hazardous Environmental Condition uncovered or revealed at <br /> document such consequences. An equitable the Site which was not shown or indicated in Drawings or <br /> adjustment shall be made in the Contract Price of Specifications or identified in the Contract Documents <br /> to be <br /> Contract Tines, or both, to the extent that they are within the scope of the Work. CONTRACTOR <br /> shall be <br /> attributable to the existence or location of any responsible for a Hazardous Environmental Condition created <br /> Underground Facility that was not shown or indicated or with any materials brought to the Site by CONTRACTOR, <br /> not shown or indicated with reasonable accuracy in the Subcontractors, Suppliers, or anyone else for whom <br /> Contract Documents and that CONTRACTOR did not CONTRACTOR is responsible. <br /> know of and could not reasonably have been expected <br /> to be aware of or to have anticipated. If OWNER and D. If CONTRACTOR encounters a Hazardous <br /> CONTRACTOR are unable to agree on entitlement to or Environmental Condition or if CONTRACTOR or anyone for <br /> 00700 - 11 <br />