Laserfiche WebLink
7.02 Coordination <br /> 8.07 Change Orders <br /> A. If OWNER intends to contract with others for the <br /> performance of other worts on the Project at the Site, the A. OWNER is obligated to execute Change Orders <br /> as <br /> following will be set forth in Supplementary Conditions: indicated in paragraph 10.03. <br /> 1 . the individual or entity who will have authority and 8. 08 Inspections, Tests, and Approvals <br /> responsibility for coordination of the activities among the <br /> various contractors will be identified; A. OWNER's responsibility in respect to certain <br /> inspections, tests, and approvals is set forth in paragraph <br /> 2.the specific matters to be covered by such 13.03.B. <br /> authority and responsibility will be itemized; and <br /> 8 .09 Limitations on OWNER's Responsibilities <br /> 3. the extent of such authority and responsibilities <br /> will be provided. A. The OWNER shall not supervise, direct, or have <br /> control or authority over, nor be responsible for, <br /> B. Unless otherwise provided in the Supplementary CONTRACTOR's means, methods, techniques, sequences, or <br /> Conditions, OWNER shall have sole authority and responsibility procedures of construction, or the safety precautions and <br /> for such coordination. programs incident thereto, or for any failure of CONTRACTOR <br /> to comply with Laws and Regulations applicable to the <br /> performance of the Work. OWNER will not be responsible for <br /> ARTICLE 8 - OWNER'S RESPONSIBILITIES CONTRACTOR's failure to perform the Work in accordance <br /> with the Contract Documents. <br /> 8.01 Communications to Contractor 8. 10 Undisclosed Hazardous Environmental Condition <br /> A. Except as otherwise provided in these General Condi- A. OWNER's responsibility in respect to an undisclosed <br /> tions, OWNER shall issue all communications to Hazardous Environmental Condition is set forth in paragraph <br /> CONTRACTOR through ENGINEER. 4.06• <br /> 8.02 Replacement of ENGINEER 8. 11 Evidence of Financial Arrangements <br /> A. In case of termination of the employment of A. If and to the extent OWNER has agreed to furnish <br /> ENGINEER, OWNER shall appoint an engineer to whom CONTRACTOR reasonable evidence that financial <br /> CONTRACTOR makes no reasonable objection, whose status arrangements have been made to satisfy OWNER's obligations <br /> under the Contract Documents shall be that of the former under the Contract Documents, OWNER's responsibility <br /> in <br /> ENGINEER. respect thereof will be as set forth in the Supplementary <br /> Conditions. <br /> 8.03 Furnish Data <br /> A. OWNER shall promptly fumish the data required of ARTICLE 9 - ENGINEER'S STATUS DURING <br /> OWNER under the Contract Documents. CONSTRUCTION <br /> 8.04 Pay Promptly When Due <br /> 9.01 OWNER'S Representative <br /> A. OWNER shall make payments to CONTRACTOR <br /> promptly when they are due as provided in paragraphs 14.02.0 A. ENGINEER will be OWNER's representative during <br /> and 14.07.C. the construction period. The duties and responsibilities and the <br /> limitations of authority of ENGINEER as OWNER's <br /> 8.05 Lands and Easements, Reports and Tests representative during oonsbimbon are set forth in the Contract <br /> Documents and will not be changed without written consent of <br /> A. OWNER's duties in respect of providing lands and OWNER and ENGINEER. <br /> easements and providing engineering surveys to establish <br /> reference points are set forth in paragraphs 4.01 and 4.05. 9.02 visits to site <br /> Paragraph 4.02 refers to OWNER's identifying and making <br /> available to CONTRACTOR copies of reports of explorations A. ENGINEER will make visits to the Site at intervals <br /> and tests of subsurface conditions and drawings of physical appropriate to the various stages of construction as ENGINEER <br /> conditions in or relating to existing surface or subsurface deems necessary in order to observe as an <br /> experienced and <br /> structures at or contiguous to the Site that have been utilized by qualified design professional the progress that has been made <br /> ENGINEER in preparing the Contract Documents. and the quality of the various aspects of CONTRACTOR's <br /> executed Work. Based on information obtained during such <br /> 8.06 Insurance visits and observations, ENGINEER, for the benefit of OWNER, <br /> will determine, in general, if the Work is proceeding in <br /> A. OWNER's responsibilities, if any, in respect to accordance with the Contract Documents. ENGINEER will not <br /> purchasing and maintaining liability and property insurance are be required to make exhaustive or continuous inspections <br />on <br /> set forth in Article 5. the Site to check the quality or quantity of the Work. <br /> 00700 - 22 <br />