Laserfiche WebLink
r <br /> ENGINEER's efforts will be directed toward providing for 9.06 Rejecting Defective Work <br /> OWNER a greater degree of confidence that the completed <br /> Work will conform generally to the Contract Documents. On the A. ENGINEER will have authority to disapprove or reject <br /> basis of such visits and observations, ENGINEER will keep Work which ENGINEER believes to be defective, <br /> or that <br /> OWNER informed of the progress of the Worts and will ENGINEER believes will not produce a completed <br /> Project that <br /> endeavor to guard OWNER against defective Work conforms to the Contract Documents or that will prejudice the <br /> integrity of the design concept of the completed Project as a <br /> B. ENGINEER's visits and observations are subject to all functioning whole as indicated by the Contract Documents. <br /> the limitations on ENGINEER's authority and responsibility set ENGINEER will also have authority to require special inspection <br /> forth in paragraph 9. 10, and particularly, but without limitation, or testing of the Work as provided in paragraph 13.04, whether <br /> during or as a result of ENGINEER's visits or observations of or not the Work is fabricated, installed, or completed. <br /> CONTRACTOR's Work ENGINEER will not supervise, direct, <br /> control, or have authority over or be responsible for 9. 07 Shop Drawings, Change Orders and Payments <br /> CONTRACTOR's means, methods, techniques, sequences, or <br /> procedures of construction; or the safety precautions and A. In connection with ENGINEER's authority as to Shop <br /> programs incident thereto, or for any failure of CONTRACTOR Drawings and Samples, see paragraph 6. 17. <br /> to comply with taws and Regulations applicable to the B In connection with ENGINEER's authority <br /> as to <br /> performance of the Work. <br /> Change Orders, see Articles 101 11 , and 12. <br /> 9.03 Project Representative <br /> C. In connection with ENGINEER's authority as to <br /> A. If OWNER and ENGINEER agree, ENGINEER will Applications for Payment, see Article 14. <br /> fumish a Resident Project Representative to assist ENGINEER <br /> in providing more extensive observation of the Work The 9.08 Determinations for Unit Price Work <br /> responsibilities and authority and limitations thereon of any such <br /> Resident Project Representative and assistants will be as A. ENGINEER will determine the actual quantities and <br /> provided in paragraph 9. 10 and in the Supplementary classifications of Unit Price Work perfomred by <br /> Conditions. If OWNER designates another representative or CONTRACTOR. ENGINEER will review with CONTRACTOR <br /> agent to represent OWNER at the Site who is not ENGINEER's the ENGINEER's preliminary determinations on such matters <br /> Consultant agent or employee, the responsibilities and authority before rendering a written decision thereon (by recommendation <br /> and limitations thereon of such other individual or entity will be of an Application for Payment or otherwise). ENGINEER's <br /> as provided in the Supplementary Conditions. written decision thereon will be final and binding (except as <br /> modified by ENGINEER to reflect changed factual conditions or <br /> 9.04 Clarifications and Interpretations more accurate data) upon OWNER and CONTRACTOR, <br /> subject to the provisions of paragraph 10.05. <br /> A. ENGINEER will issue with reasonable promptness <br /> such written clarifications or interpretations of the requirements 9. 09 Decisions on Requirements of Contract Documents <br /> of the Contract Documents as ENGINEER may determine and Acceptability of Work <br /> necessary, which shall be consistent with the intent of and <br /> reasonably inferable from the Contract Documents. Such A. ENGINEER will be the initial interpreter <br /> of the <br /> written clarifications and interpretations will be binding on requirements of the Contract Documents and <br /> judge of the <br /> OWNER and CONTRACTOR If OWNER and CONTRACTOR acceptability of the Work thereunder. Claims, disputes and <br /> are unable to agree on entitlement to or on the amount or other matters relating to the acceptability <br /> of the Work, the <br /> extent, if any, of any adjustment in the Contract Price or quantities and classifications of Unit Price Work, the <br /> Contract Times, or both, that should be allowed as a result of a interpretation of the requirements of the Contract Documents <br /> written clarification or interpretation, a Claim may be made pertaining to the performance of the Work, and Claims seeking <br /> therefore as provided in paragraph 10.05. changes m the Contract Price or Contract Times will be referred <br /> initially to ENGINEER in writing, in accordance with the <br /> 9.05 Authorized Variations in Work provisions of paragraph 10.05, with a request for a formal <br /> decision. <br /> A. ENGINEER may authorize minor variations in the <br /> Work from the requirements of the Contract Documents which B. When functioning as interpreter and judge under this <br /> do not imroMe an adjustment in the Contract Price or the paragraph 9.09, ENGINEER will not show partiality to <br /> OWNER <br /> Contract Tares and are compatible with the design concept of or CONTRACTOR and will not be liable in connection with any <br /> the completed Project as a functioning whole as indicated by the interpretation or decision rendered in good faith <br /> in such <br /> Contract Documents. These may be accomplished by a Field capacity. The rendering of a decision by ENGINEER pursuant <br /> Order and will be binding on OWNER and also on to this paragraph 9.09 with respect to any such Claim, dispute, <br /> CONTRACTOR, who shall perform the Work involved promptly. or other matter (except any which have been waived by the <br /> N OWNER and CONTRACTOR are unable to agree on making or acceptance of final payment as <br /> provided in <br /> entitlement to or on the amount or extent, if any, of any paragraph 14.07) will be a condition precedent <br /> to any exercise <br /> adjustment in the Contract Price or Contract Times, or both, as by OWNER or CONTRACTOR of such rights or remedies as <br /> a result of a Field Order, a Claim may be made therefore as either may otherwise have under the Contract Documents or <br /> by <br /> provided in paragraph 10.05. Laws or Regulations in respect of any such Claim, dispute, or <br /> other matter. <br /> 00700 - 23 _ <br />