My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC-13 .03 Test and Inspections <br /> SC- 13 .03 . 13 , Delete the first sentence of paragraph GC 13. 03. 8 (up to the colon) in its entirety, and <br /> insert the following sentences in its place: <br /> B . OWNER shall employ and pay for the services of an independent testing laboratory <br /> to perform all initial inspections , tests , or approvals required by the Contract <br /> Documents except those inspections, tests , or approvals listed immediately below. <br /> Subsequent inspections, tests , or approvals required after initial failing inspections, <br /> tests, or approvals shall be paid for by the CONTRACTOR by backcharge to <br /> subsequent applications for payment. The following inspections, tests, or approvals <br /> shall be provided by and paid for by the CONTRACTOR. <br /> 1 , Proctor Testing 3 . Leakage Testing <br /> 2 , Density Testing 4 . Hydrostatic Testing <br /> 14.02 Progress Payments <br /> SC= 14 . 02 .A.2 Delete paragraph GC= 14. 02.A. 2 in its entirety and insert the following paragraph in its <br /> place: <br /> The CONTRACTOR shall make the following certification (Affidavit) on each request for payment: <br /> "I hereby certify that the labor and materials listed on this request for <br /> payment have been used in the construction of this work and payment <br /> received from the last request for payment has been used to make payments <br /> to all subcontractors, laborers, material men and suppliers except as listed <br /> below. " <br /> SCA4. 02 . B. 5 . Add the following sentences at the end of paragraph GG14. 02. 8. 5: <br /> e. the work for which payment is requested cannot be verified ; <br /> f. failure of CONTRACTOR to make proper payments to Subcontractor for labor, <br /> materials or equipment in connection with the Work; <br /> g . OWNER has been required to pay ENGINEER or ENGINEER'S Consultant <br /> additional compensation because of CONTRACTOR delays or rejection of <br /> defective Work; or <br /> h . OWNER has been required to pay an independent testing laboratory for subsequent <br /> inspections, tests, or approvals taken after initial failing inspections , tests , or <br /> approvals . <br /> ' SCA 4. 02 . C. 1 Delete paragraph GG 14. 02. C. 1 in its entirety and insert the following paragraph in its <br /> place: <br /> C . Payment Becomes Due <br /> 1 Payment shall be made by OWNER to CONTRACTOR according to the Florida Prompt <br /> Payment Act. <br /> 14.07 Final Payment <br /> SC- 14. 07. C. 1 Delete paragraph GG 14. 07. C. 1 in its entirety and insert the following paragraph in its <br /> place: <br /> C . Payment Becomes Due <br /> 1 Payment shall be made by OWNER to CONTRACTOR according to the Florida Prompt <br /> ' Payment Act. <br /> 00800 - 6 00800 - Supplementary conditions <br /> QWY ooamenb â–ºooeoo - SLPOWe KWY Cordib" w Rev. 05MI <br />
The URL can be used to link to this page
Your browser does not support the video tag.