Laserfiche WebLink
ARTICLE 6. INTEREST. <br /> Not Applicable. <br /> ARTICLE 7. CONTRACTOR'S REPRESENTATIONS. <br /> In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br /> representations: <br /> 7.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br /> Documents, work, site, locality, and all local conditions and laws and regulations <br /> that in any manner may affect cost, progress, performance or furnishing of the <br /> work. <br /> 7.2 CONTRACTOR has studied carefully all reports of explorations and tests of <br /> subsurface conditions and drawings of physical conditions which are identified in <br /> the Supplementary Conditions as provided in Paragraph 4.2 of the General <br /> Conditions, and accepts the determination set forth in Paragraph SC-4.2 of the <br /> Supplementary Conditions of the extent of the technical data contained in such <br /> reports and drawings upon which CONTRACTOR is entitled to rely. <br /> 7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br /> obtaining and carefully studying) all such examinations, investigations, <br /> explorations, tests, reports and studies (in addition to or to supplement those <br /> referred to in Paragraph 7.2 above) which pertain to the subsurface or physical <br /> conditions at or contiguous to the site or otherwise may affect the cost, progress, <br /> performance or furnishing of the work as CONTRACTOR considers necessary for <br /> the performance of furnishing of the work at the Contract Price, within the Contract <br /> Time and in accordance with the other terms and conditions of the Contract <br /> Documents, including specifically the provisions of Paragraph 4.2 of the General <br /> Conditions; and no additional examinations, investigations, explorations, tests, <br /> reports, studies or similar information or data are or will be required by <br /> CONTRACTOR for such purposes. <br /> 7.4 CONTRACTOR has reviewed and checked all information and data shown or <br /> indicated on the Contract Documents with respect to existing underground facilities <br /> at or contiguous to the site and assumes responsibility for the accurate location of <br /> said underground facilities. No additional examinations, investigations, <br /> explorations, tests, reports, studies or similar information or data in respect of said <br /> underground facilities are or will be required by CONTRACTOR in order to perform <br /> and furnish the work at the Contract Price, within the Contract Time and in <br /> accordance with the other terms and conditions of the Contract Documents, <br /> including specifically the provisions of Paragraph 4.3 of the General Conditions. <br /> 00530-4 <br /> C:\DOCUME-1\gordons\LOCALS-1\Temp\00530 EJCDC-REVISED(per Marion)Agreement between Owner and Contractor.doc <br />