Laserfiche WebLink
7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br /> investigations, explorations, tests, reports and studies with the terms and <br /> conditions of the Contract Documents. <br /> 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or <br /> discrepancies that he has discovered in the Contract Documents and the written <br /> resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br /> ARTICLE 8. CONTRACT DOCUMENTS. <br /> The Contract Documents which comprise the entire agreement between OWNER and <br /> CONTRACTOR concerning the work consist of the following: <br /> 8.1 This Agreement (Section 00530). <br /> 8.2 Performance and other bonds (Sections 00610 and 00620). <br /> 8.3 Notice of Award and Notice to Proceed. <br /> 8.4 General Conditions (Section 00700). <br /> 8.5 Supplementary Conditions (Section 00800). <br /> 8.6 Specifications bearing the title IRC DTTS Water and Wastewater Utility Standards. <br /> January,, 1997 or latest version. <br /> 8.7 Drawings, inclusive with each sheet bearing the following general title "OLD DIXIE <br /> HIGHWAY 16" DIAMETER FORCE MAIN" <br /> 8.8 Addenda numbers 1 to 1 , inclusive. <br /> 8.9 CONTRACTOR'S Bid (Section 00310). <br /> 8.10 Indian River County Water and Wastewater Utility Standards. <br /> 8.11 The following, which may be delivered or issued after the effective date of the <br /> Agreement and are not attached hereto: All written amendments and other <br /> documents amending, modifying, or supplementing the Contract Documents <br /> pursuant to Paragraphs 3.4 and 3.5 of the General Conditions. <br /> There are no Contract Documents other than those listed above in this Article 8. The Contract <br /> Documents may only be amended, modified or supplemented as provided in Paragraphs 3.4 and <br /> 3.5 of the General Conditions. <br /> 00530-5 <br /> C:\DOCUME-1\gordons\LOCALS-1\Temp\00530 EJCDC-REVISED(per Marion)Agreement between Owner and Contractor.doc <br />