66" Avenue and 16" Street Improvements EXH , <br /> Universal Proposal No. 9996. 0209. 00008 rev BIT A <br /> Pa e 3 <br /> Scheduling And Cost Estimate <br /> The field work can be scheduled to begin , based on our Present schedule , <br /> within one week <br /> after receiving the written authorization to proceed . Universal expects the field work to require <br /> require approximately two to three days to prepare a2 working days to complete . Our laboratory testing analysis and report preparation <br /> will <br /> after completion of the field work . A final zation <br /> geotechnical report should be submitted within three weeks from receiving the authori <br /> to proceed . If this schedule needs to be amended or if special scheduling considera <br /> required please advice us . tion is <br /> The fee for the subsurface exploration and geotechnical engineering report is $ 2 , 593 . 00 . This <br /> estimate will not be exceeded without prior written authorization . For specific terms of the <br /> proposed work , please refer to our continuing services contract terms and conditions . <br /> CONSTRUCTION MATERIALS TESTING ( CMT) SCOPE OF SERVICES <br /> Based on review of the project documents and our experience in the area , <br /> provide the following : Universal will <br /> • On -call earthwork , asphalt and concrete testing <br /> • Engineering overview of our services <br /> The laboratory testing will be performed out of our Fort Pierce , Florida office with additional <br /> support from our Rockledge , Florida office , if required . During the duration of the project all <br /> technicians and personnel involved with the construction testing and inspection will be <br /> supervised by a Professional Engineer ( P . E . ) registered in the State of Florida . <br /> The following assumptions were made to develop the estimated scope of services : <br /> • Roadway construction will be phased into at least two separate operations , <br /> travel lane , and compaction tests will be performed every 500 linear feet . one per <br /> • Curb pad and stabilized shoulders will be constructed as a separate operation from the <br /> mainline roadway construction , and compaction tests will be performed every 500 <br /> linear feet . <br /> • Stabilized subgrade will be sampled and tested for Limerock Bearing Ratio ( LBR ) <br /> every 1 , 000 linear feet per width of roadway operation and density will be checked as <br /> a single 124ch lift . <br /> • Base course will be sampled and tested for Limerock Bearing Ratio (LBR ) every 2 , 000 <br /> linear feet per width of roadway operation and density will be checked as two 4 - inch <br /> lifts . <br /> • Utility pipe and structures will be tested for compaction for the full depth of fill in 6 - inch <br /> lifts at 100 % of a standard Proctor test (AASHTO T99 ) in accordance with the project <br /> plans . Tests will be performed at a minimum frequency of one per every 200 linear feet <br /> or one per pipe run . <br /> • A minimum of three feet ( vertical ) of roadway subgrade ( embankment) will be <br /> compacted and tested at a frequency of one per every 500 linear feet . <br /> • No compaction testing will be required for the perforated bituminous coated corrugated <br /> metal pipe ( BCCMP ) . <br /> • No density compaction testing will be required for the 4- inch underdrains . <br />