Laserfiche WebLink
6d ' Avenue and 16`h Street Improvements EX H , B ! T A <br /> Universal Proposal No. 9910. 0209. 00008 rev <br /> Page 4 <br /> • The sidewalk subgrade will be tested for compaction as a single six- inch lift at a <br /> frequency of once every 500 linear feet . <br /> Cost of Services <br /> The services listed herein will be invoiced on a unit rate basis per the estimated scope . Note <br /> that the budget is an estimate of our services and may change as the result of unforeseen <br /> events such as requested standby time , overtime , retesting , etc . Pick up charges are not <br /> included in soil or concrete testing rates . A minimum of four density tests are required per <br /> trip . The estimated cost of services is separated into three individual phases based on the <br /> construction documents . <br /> 16th Street Improvements - From 74th Ave to 66th Ave <br /> Soils <br /> In Place Density Tests (embankment) <br /> Estimate 70 each @ $ 24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . $ 1 , 680 . 00 <br /> In Place Density Tests ( stabilized subgrade ) <br /> Estimate 36 each @ $ 24 . 00/each . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . $ 864 . 00 <br /> . . . . . . . . . . . . . . . . . <br /> In Place Density Tests ( base course ) <br /> Estimate 36 each @ $ 24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . $ 864 . 00 <br /> In Place Density Tests (sidewalk subgrade ) <br /> Estimate 10 each @ $ 24 . 00/each . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . $240 . 00 <br /> . . . . . . . . . . . . . . . . <br /> In Place Density Tests ( utility pipe backfill ) <br /> Estimate 155 each @ $ 24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . <br /> In Place Density Tests ( utility structure backfill ) <br /> Estimate 125 each @ $ 24 . 00/each . . . . . . , <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . $ 3 , 000 . 00 <br /> . . . . . . . . . . . . . . . . . . . . <br /> Limerock Bearing Ratio ( LBR ) Tests ( base and stabilized subgrade ) <br /> Estimate 12 each @ $ 240 . 00/each . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . $ 2 , 880 . 00 <br /> . . . . <br /> Moisture/ Density Relationship Tests (embankment and utility backfill ) <br /> Estimate 8 each @ $ 80 . 00/each . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . $ 640 . 00 <br /> Concrete <br /> Make and Break Concrete Cylinders ( set of 4 ) <br /> ( Includes 1 hour of on site time per set ) <br /> Estimate 24 sets @ $ 80 . 00/set . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . $ 1 , 920 . 00 <br /> . . . . . . . . . . . <br />