My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-070
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 9:57:55 AM
Creation date
10/1/2015 3:22:11 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/17/2009
Control Number
2009-070
Agenda Item Number
8.D.
Entity Name
Universal Engineering Sciences
Subject
Work Order No. 1 Roadway & Drainage Improvements
Area
16th Street - 74th Ave. to 66th Ave. 66th Ave.-16th St. to SR60
Project Number
9810-A, 9920, 0545
Supplemental fields
SmeadsoftID
10513
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6d ' Avenue and 16`h Street Improvements EX H , B ! T A <br /> Universal Proposal No. 9910. 0209. 00008 rev <br /> Page 4 <br /> • The sidewalk subgrade will be tested for compaction as a single six- inch lift at a <br /> frequency of once every 500 linear feet . <br /> Cost of Services <br /> The services listed herein will be invoiced on a unit rate basis per the estimated scope . Note <br /> that the budget is an estimate of our services and may change as the result of unforeseen <br /> events such as requested standby time , overtime , retesting , etc . Pick up charges are not <br /> included in soil or concrete testing rates . A minimum of four density tests are required per <br /> trip . The estimated cost of services is separated into three individual phases based on the <br /> construction documents . <br /> 16th Street Improvements - From 74th Ave to 66th Ave <br /> Soils <br /> In Place Density Tests (embankment) <br /> Estimate 70 each @ $ 24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . $ 1 , 680 . 00 <br /> In Place Density Tests ( stabilized subgrade ) <br /> Estimate 36 each @ $ 24 . 00/each . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . $ 864 . 00 <br /> . . . . . . . . . . . . . . . . . <br /> In Place Density Tests ( base course ) <br /> Estimate 36 each @ $ 24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . $ 864 . 00 <br /> In Place Density Tests (sidewalk subgrade ) <br /> Estimate 10 each @ $ 24 . 00/each . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . $240 . 00 <br /> . . . . . . . . . . . . . . . . <br /> In Place Density Tests ( utility pipe backfill ) <br /> Estimate 155 each @ $ 24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . <br /> In Place Density Tests ( utility structure backfill ) <br /> Estimate 125 each @ $ 24 . 00/each . . . . . . , <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . $ 3 , 000 . 00 <br /> . . . . . . . . . . . . . . . . . . . . <br /> Limerock Bearing Ratio ( LBR ) Tests ( base and stabilized subgrade ) <br /> Estimate 12 each @ $ 240 . 00/each . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . $ 2 , 880 . 00 <br /> . . . . <br /> Moisture/ Density Relationship Tests (embankment and utility backfill ) <br /> Estimate 8 each @ $ 80 . 00/each . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . $ 640 . 00 <br /> Concrete <br /> Make and Break Concrete Cylinders ( set of 4 ) <br /> ( Includes 1 hour of on site time per set ) <br /> Estimate 24 sets @ $ 80 . 00/set . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . $ 1 , 920 . 00 <br /> . . . . . . . . . . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.