Laserfiche WebLink
SECTION 8 <br /> SUBMERSIBLE WASTEWATER <br /> PUMPING STATION _ <br /> 8.01 GENERAL <br /> A. The station shall be complete with pumps, motors , piping , valves , <br /> electrical work (including motor controls) , structure, connections <br /> and all other needed appurtenances , tested and ready for service <br /> prior to the sign-off or acceptance by IRCDUS . <br /> B . These specifications are intended to give a general description of <br /> what is required , but do not cover all details , which will vary in r <br /> accordance with the requirements of the equipment as offered . It <br /> is , however, intended to cover the furnishing , the shop testing , the <br /> delivery and complete installation and field testing of all materials , .� <br /> equipment and appurtenances for the complete pumping units as <br /> herein specified , whether specifically mentioned in these <br /> specifications or not. <br /> C. For all units there shall be furnished and installed all necessary <br /> and desirable accessory equipment and auxiliaries , whether <br /> specifically mentioned in these specifications or not, and as r` <br /> required for an installation incorporating the highest standard for <br /> the type of service , including field testing of the entire installation <br /> and instructing the IRCDUS's regular operating personnel in the <br /> care, operation and maintenance of all equipment. <br /> D. All private lift stations must provide a repair company name and r+ <br /> emergency telephone number on the electrical panel in case of a <br /> malfunction to the station . If a name and number is not provided , <br /> the IRCDUS reserves the right to call a company of it's choosing ., <br /> to make a service call and repair the malfunctioning station . All <br /> charges to repair said station shall be charged to the owner of the <br /> station . <br /> r <br /> E . A manhole shall be constructed within 20' upstream of a lift <br /> station . There shall be only one pipe connection from this manhole <br /> to the lift station . The pipe between the lift station and manhole <br /> shall be SDR-26 or C-900 PVC pipe . <br /> 8 .02 DESCRIPTION OF SYSTEMS <br /> The pump station shall be comprised of a concrete wet well , concrete <br /> valve pit, RTU , at least two submersible wastewater pumps and controls , 'r <br /> discharge piping and all appurtenances as specified herein or needed . <br /> The pump station will pump raw, unscreened , domestic wastewater into a <br /> force main . r <br /> r <br /> 8 - 1 <br /> r <br />