Laserfiche WebLink
r <br /> 8 . 03 QUALIFICATION <br /> A. To assure unity of responsibility, the motors and control system <br /> r shall be furnished and coordinated by the pump manufacturer. <br /> The Engineer of Record shall assume responsibility for the <br /> satisfactory installation and operation of the entire pumping <br /> r <br /> system , including pumps , motors , and controls as specified . <br /> B . The pumps covered by these specifications are intended to be <br /> standard pumping equipment of proven ability as manufactured by <br /> a reputable manufacturer having extensive experience in the <br /> production of such pumps. The pumps furnished shall be <br /> designed , constructed and installed in accordance with the best <br /> r practice and methods, and shall operate satisfactorily when <br /> installed . Pumps shall be manufactured in accordance with the <br /> Hydraulic Institute Standards . <br /> r <br /> C. The control system shall have an established record of successful <br /> performance for similar service and be approved by the IRCDUS. <br /> r <br /> D . All equipment furnished under this specification shall be new, and <br /> shall be the standard product of manufacturers having a <br /> successful record of manufacturing and servicing the equipment <br /> and systems specified herein for a minimum of five (5) years . <br /> E . The pumps shall be furnished complete with controls and <br /> accessories required , and shall be as on the Approved <br /> Manufacturer's Product List. Grinders pumps shall be permitted <br /> for pumps 10 .0 HP or less, unless otherwise approved by <br /> r IRCDUS's Engineer. Three phase electrical power will be <br /> required for all pumping stations . 120/240 volt service will be <br /> required for pump stations up to 20hp . 277/480 volt service will be <br /> r required for pump stations larger than 20hp . <br /> 8 .04 OPERATING INSTRUCTIONS <br /> r <br /> A. Operating and maintenance manuals shall be furnished. The <br /> manuals shall be prepared specifically for this installation and <br /> ., , shall include all required cuts, drawings , equipment lists , <br /> descriptions , etc. , that are required to instruct operating and <br /> maintenance personnel unfamiliar with such equipment. The <br /> r number and special requirements shall be as specified by the <br /> County. <br /> B . A factory representative of all major component manufacturers, <br /> who has complete knowledge of <br /> p g proper operation and <br /> maintenance , shall be provided for one ( 1 ) full day to instruct <br /> representatives of the Owner and the Engineer on proper <br /> operation and maintenance. If there are difficulties in operation of <br /> r <br /> 8 - 2 <br /> r <br />