Laserfiche WebLink
+� 4 . Tunneling shall be preformed by a fluid-cutting process (high <br /> pressure-low volume ) utilizing liquid clay i . e . bentonite . The <br /> clay lining will maintain tunnel stability and provide lubrication <br /> in order to reduce frictional drag while the pipe is being <br /> installed . In addition , the clay fluid must be totally inert and <br /> contain no environmental risk. The Contractor must also have <br /> a mobile vacuum spoils recovery vehicle on site to remove the <br /> drilling spoils from the access pits . The spoils must then be <br /> transported from the job site and be properly disposed off the <br /> site. The drilling spoils shall not, under any circumstances , be <br /> ' disposed into a sanitary sewer, storm , or other public or <br /> private drainage system . Spoils may be transported to the <br /> County's Solid Waste Facility and the cost of disposal shall be <br /> by the County. <br /> 5 . Liquid clay type colloidal drilling fluid shall consist of at least 10 <br /> percent of high-grade carefully processed bentonite to <br /> consolidate cuttings of the soil , to seal the walls of the hole, <br /> and to furnish lubrication for subsequent removal of cuttings . <br /> The slurry that is heavier than the surrounding material , is high <br /> .r in colloids of the bentonite type and it will deposit a thin filter <br /> cake of low permeability material on the walls of the bore. This <br /> will allow only a small amount of the fluid to pass into the <br /> surrounding soils and will stabilize the bore . The colloidal <br /> content of the fluid imparts excellent lubricating qualities to the <br /> slurry that is a distinct aid to the removal of the soil cuttings . <br /> 6 . Pneumatic or water-jetting methods will be considered <br /> unacceptable due to the possibility of surface subsidence . <br /> 7 . After an initial bore has been completed , a reamer will be <br /> installed at the termination pit and the pipe shall be pulled <br /> ' back to the starting pit. The reamer shall be capable of <br /> discharging liquid clay to facilitate the installation of the pipe <br /> into a stabilized and lubricated tunnel . <br /> 8 . A minimum of two (2 ) insulated #6 stranded tracer wire shall <br /> be installed along with the PE pipe . The tracer wire shall be <br /> tested for continuity upon completed installation . Should both <br /> tracer wires fail to test for continuity then the test shall be <br /> considered a failure and the wires shall be replaced . Tracing <br /> wires, #10 stranded conductor copper, shall be wrapped or <br /> .. affixed to the top of the pipe and fittings . <br /> 9 . Upon completion of boring and pipe installation , the Contractor <br /> shall remove all spoils from the starting and termination pits . <br /> ., All pits shall be restored to their original condition . <br /> 10 . The shoulders , ditches , banks , and slopes of roads and <br /> railroads crossed and paralleled shall not wash out before <br /> becoming consolidated . Restoration shall be as required by <br /> the jurisdictional authority and as specified within the Contract <br /> Document. <br /> END OF SECTION <br /> 3 - 11 <br />