My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-078
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 2:07:31 PM
Creation date
9/30/2015 7:26:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
04/06/2004
Control Number
2004-078
Agenda Item Number
11.J.1
Entity Name
Department of Utility Services
Subject
Utility Services Water Wastewater Utility Standards
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3719
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . The pumps covered by these specifications are intended to be <br /> standard pumping equipment of proven ability as manufactured by <br /> a reputable manufacturer having extensive experience in the <br /> production of such pumps . The pumps furnished shall be <br /> designed , constructed and installed in accordance with the best <br /> practice and methods , and shall operate. satisfactorily when <br /> installed . Pumps shall be manufactured in accordance with the <br /> Hydraulic Institute Standards , <br /> C . The control system shall have an established record of successful <br /> performance for similar service and be approved by the IRCDUS . <br /> D . All equipment furnished under this specification shall be new, and <br /> shall be the standard product of manufacturers having a <br /> successful record of manufacturing and servicing the equipment <br /> and systems specified herein for a minimum of five (5 ) years . <br /> E . The pumps shall be furnished complete with controls and <br /> accessories required , and shall be as on the Approved <br /> Manufacturer's Product List. Grinders pumps shall be permitted <br /> for pumps 10 . 0 HP or less , unless otherwise approved by <br /> IRCDUS 's Engineer. Three phase electrical power will be <br /> required for all pumping stations . 120/240 volt service will be <br /> required for pump stations up to 25hp . 277/480 volt service will be <br /> required for pump stations larger than 25hp . <br /> 8 . 04 OPERATING INSTRUCTIONS <br /> A. Operating and maintenance manuals shall be furnished . The <br /> manuals shall be prepared specifically for this installation and <br /> shall include all required cuts , drawings , equipment lists , <br /> descriptions , etc. , that are required to instruct operating and <br /> maintenance personnel unfamiliar with such equipment . The <br /> number and special requirements shall be as specified by the <br /> County. <br /> B . A factory representative of all major component manufacturers , <br /> who has complete knowledge of proper operation and <br /> maintenance , shall be provided for one ( 1 ) full day to instruct <br /> representatives of the Owner and the Engineer on proper <br /> operation and maintenance . If there are difficulties in operation of <br /> the equipment due to the manufacturer' s design or fabrication , <br /> additional service shall be provided at no cost to the Owner. <br /> 8 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.